Skip to main content
search

A36 Facilities/Temporary Work/Services G#1708 N#1610

By 7 December 2014November 13th, 2018Uncategorized

ABOUT > PAGES > DESIGN > CODECHECKLIST > NEW BUILD > A > G#1708 N#1610

A36 Facilities/Temporary Work/Services

A36 Facilities/ Temporary Work/Services
Checklist: 


Problems:


Misunderstandings:


Solutions:


Value Engineering: (stuff into projects not out of them)


Consider:

  • Electricity Supply:
    • ensure all sites are required to use a Green Tariff electricity supply throughout the works, commissioning and testing period and hand over the building to the Employer (Client) with the same Green Tariff electricity supply
  • Waste:
    • minimization, segregation and management
    • See Also: A38 Waste & A39 Packaging Waste

Avoid:


Minimise:


Substitute:


Resource Efficiency:


Reduce:


Reclaim:


Reuse:

  • Store materials to prevent deterioration
  • Permit the use of opened and resealed and unopened tins of paint from the contract to be stored on site for use in snagging
  • Permit the use of unopened tins from the contract to be stored on site for use in 6 month defect repairs
  • Permit the use of unopened tins from the contract to be stored on site for use by the FM in maintenance of the building in use

Recycling:

  • Collect, segregate, reuse or recycle all redundant material.

Recover:


Waste Issues:


Waste Category:


Hazardous waste:


Waste statistics:

  • 9.4 m tonnes (10.2% of 90 m. tonnes/year) of waste is Temporary works, Site hoardings and Formwork
  • 3.7 m tonnes (4.1% of 90 m tonnes/year) of waste comes from Site Office and Canteen

End of life options:


Health and Safety Issues:


Wellbeing:


Maintenance issue:


Precautionary principle:


Biodiversity:


Information sources:


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
6th December 2014 – 13th November 2018

A36 Facilities/ Temporary Work/Services
Images:


 


If you wish to reproduce images, feel free, but please acknowledge the source.


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
6th December 2014 – 13th November 2018

A36 Facilities/ Temporary Work/Services
See Also:


NGS CPD


NGS JARGON BUSTER

Initials, Abbreviations, Acronyms
  • MOBS
  • VE
Names and phrases
  • Green Tariff
  • Management and Operation of Buildings Sustainable (MOBS)
  • Value Engineering (VE)

NGS PROJECTS


NGS SPECIFICATIONS

NGS ROBUST SPECIFICATION

GreenBuildingSpecification


NGS PRODUCTS

Recycled:

Temporary floor protection:

  • Secondary cellulose fibre, recyclable or compostable after use
  • Manufacturer: Florprotec Ltd
  • Product Reference: Floortech

Temporary weatherproof sheeting:

  • 90% recycled LDPE (post consumer (water drainage pipes, milk bottles, drums, fertilisers bags)
  • Manufacturer: Extrusion and Moulding Compounds
  • Product name: Temporary sheeting

NGS LIBRARY


NGS LINKS


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
6th December 2014 – 13th November 2018

Leave a Reply

Close Menu