Index: 


D1        Ground stabilisation/dewatering

  • D10      Ground investigation
  • D11      Soil stabilization
  • D12      Site dewatering

D2        Excavation/filling

  • D20      Excavating & Filling Resource Recovery/Waste Minimisation
  • D21      Ground Gas Venting
  • D21      Landfill capping

D3        Piling

  • D30      Piling
  • D31      Preformed concrete piling
  • D32      Steel piling
  • D33      Timber piling
  • D34      Steel Auger/Corkscrew piling

D4        Ground retention

  • D40      Embedded retaining walls
  • D41      Crib walls/Gabions/Drystack masonry/Reinforced earth
  • D45      Soil nailing

D5        Underpinning

  • D50      Underpinning

© CCPI 1987 & 1998
© NBS 1987-2013
© ASWS NGS GBE BrianSpecMan aka BrianSpecMan
1987 – 9th March 2015

D Groundwork
Images: 


SteelPlate.jpg


© NGS GBE BrianSpecMan aka Brian Murphy
9th March 2015 

D Groundwork
See Also:


NGS CHECKLIST

  • D Groundwork


NGS JARGON BUSTER

  • D Groundwork

© CCPI 1987 & 1998
© NBS 1987-2013
© ASWS NGS GBE BrianSpecMan aka BrianSpecMan
1987 – 7th January 2013 – 9th March 2015

Leave a Reply