GBE > Blog > News > Diary > 2016 > G#13767
GBE Diary 2016 Q4
GBE Diary 2016 Q2 (Archive); GBE Diary 2016 Q3 (Archive); GBE Diary 2016 Q4 (Current) This page
GBE Diary 2015 Q4 (Archive); GBE Diary 2016 Q1 (Archive)
GBE Diary 2016 Q4
GBE Diary October 2016
1-9: Waste Reduction by Design Second ZWS tender with Enscape Ltd.
2: GBE Marketing: Leeds Sustainability Institute RISE Award
Green Building Encyclopaedia Winner in Behavioural Change category.
2: SME Heroes Crowd Fund Campaign update proposal
4: LSBU Invited to provide 5 more seminars to Architecture RIBA Part 1 Years 2 & 3 classes
7-10: LoftZone StoreFloor GBE Product Data Collection
11: Building4Health event London, WELL promotion into UK
11-16: LSBU: Preparing 3 of 5 Lectures
13-14: LoftZone StoreFloor GBE Calculator: Thermal Bridge calculator
14: LoftZone StoreFloor GBE Method Statement export from GBE Product Data Collection
17: LSBU present lectures to Architecture RIBA Part 1 Year 2 & Year 3 and post pages on GBE
18-20: UKCW 2016 Exhibition for 3 days twitter feed of images starting here and scroll upwards
22: LoftZone StoreFloor GBE 3D CAD enquiry for update image
23: LoftZone StoreFloor System Page
23: LoftZone StoreFloor GBE LitEdit CPD
24: LSBU present lectures to Architecture RIBA Part 1 Year 2 & Year 3
25: LSBU post lectures to Architecture RIBA Part 1 Year 2 & Year 3 and update pages on GBE
26: LSBU: GBE Links to ZCH Zero Carbon Hub, page and Publications
27-30: LSBU: Prepare 5th of 5 seminars and present to Architecture RIBA Part 2 Year 3 and post files on page attendance records and email contacts
31: LoftZone StoreFloor GBE LitEdit CPD
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
23rd November 2016 – 7th December 2016
GBE Diary 2016 Q4
GBE Diary November 2016
1: LoftZone StoreFloor GBE LitEdit CPD Seminar
2-4: LoftZone StoreFloor GBE Calculator update with new interface sheet
2-4: LoftZone StoreFloor GBE Product Data Collection update
3: PLA preview working drawing details propose potential solutions and email links
4: CJWildBird Foods Ltd. Cambridge Swift Box Q&A emails and phone calls
6: LoftZone StoreFloor GBE Product Data Collection update, GBE Calculator update
7: LoftZone StoreFloor GBE Method Statement update
8-9: PLA GBE Brainstorm propose potential solutions and email links
10: Email critique of SpecifiedBy push technology email
11: Living Stone Creative contact after UKCI 2016 Show
11-14: Adapt Associates meeting at UEA Enterprise centre, presented BioBased Phase Proposal 2 page summary and 5 page details
13: LSBU CV Biog for Uni, Faculty and Course website
14: Project Logistics Architects GBE Brainstorm One off house working drawing audit
15-16: Wallgate Thrii DIS SS Handwasher drier GBE Robust Specification
16: Global Excellence Awards 2016 3rd award in 3 months for GBE
Most Outstanding Green Building Information Platform
17: Wallgate Thrii DIS SS Handwasher drier GBE Robust Specification Page
18: Project Logistics Architects: GBE Proposal: Practice Specification Template/
18: Project Logistics Architects: GBE Project Spec Audit
18: Project Logistics Architects: GBE Proposal: Project draft construction details
19: TGR Blog update Urban Climate Change & Responsive Façade Design G#13673
19: Extracting images from iPad via DropBox
20: F23 Hedge Bank Walling Specification, social media update, GBE Classify: CAWS > CAWS 2012 and Uniclass 2015
21: Wallgate Spec update (still draft)
21: CJ WildBird Feed Cambridge Swift Box Spec update (still draft)
21-22: Unhide G# and N# numbers in Update and Additions list pages (more to go)
22-23: Update GBE Templates: Updates & Additions and Diary, then create catchup pages and start populating 2016 Q4
23: GBE Marketing contacting prospects
23-24: GBE Website Page List continue collection for 301 ReDirects and interlinking websites
24: LivingStone Radiators: GBE Material Impacts, LCA & EPD proposal
25-26: CJ WildBird Feed Cambridge Swift Box Spec update (still draft)
26: Response Electronics Ltd miSmartHome enquiry follow up
27-29: Assembling page numbers and updating for 301 redirects (ongoing)
28: ERDF Funding meeting
30: GBE Future Events
30: LoftZone StoreFloor Robust Specification start
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
23rd November 2016 – 7th December 2016
GBE Diary 2016 Q4
GBE Diary December 2016
1: Ska Technical Committee
1: Continuing collecting page URLs for 301 redirects
2: LoftZone StoreFloor GBE Product Data Sheet updated
3-4: LoftZone StoreFloor GBE Robust Specification extracted from BBA Certificate
5: LivingStone Quotation for initial materials assessments
6: Discussing alternatives to BSI PAS to Biodiversity Enhancements
6-7: LoftZone StoreFloor GBE Robust Specification updated with extracts from Installation instructions, Website instructions, Video Instructions, GBE Method Statement update issued.
7: LoftZone GBE Company page
7: Green Building Store enquiry re 10 Product Specification, quotation and sample specification
7-8: GBE Issue Paper Squashed Loft Insulation from LoftZone CPD
gbe-issuepaper-squashedloftinsulation-a03brm081216 PDF8: GBE Issue Paper Squashed Loft Insulation Page
8: TGR Seminar London Part L and Zero Carbon Targets
9: Wallgate Thrii hand drier Specification feedback update issued
9: AJA Project Specification Briefing meeting
9-11: Created and added GBE K43 Raised Storage Access Systems (Checklist) G#13934 page
10: GBE Slogan “Stuffed Loft Flat Insulation Lift Your Loft Stuff” Page G#13957 Hashtag #LiftYourLoftStuff
11: LoftZone StoreFloor updating and linking more pages
12: Wind Wash (Jargon Buster) G#14021
12: Updated Cambridge Swift Box Specification A08 update issued
13: Decrement Delay Decrement Factor (Jargon Buster) G#14043
13: LoftZone StoreFloor Specification and Shop updated. Completed and posted GBE Robust Specification GBS K43 120A StoreFloor (RSW) G#14031
14: Drafted and posted GBE Robust Specification GBS N13 302A Anti-vandal WC (RSC) G#14070
15: Added Company page Wallgate Limited G#14086 and linked three Robust Specifications
15: 1st Draft, issue and posted GBE Robust Specification GBS Y53 110A WDC Electronic Controller (RSC) G#14075
16: Updated LoftZone StoreFloor GBE Product Data Collection and GBE Method Statement
16: GBE Marketing My118 listing update
17-19: VAT Accounts
19: LoftZone StoreFloor GBE Tables (System Page Table, BIM PDS, Manufacturer Page Table) from GBE Product Data Collection
20: Finalise Cambridge Swift Box Robust Specification A9 and A10 clean copy
20: Update Wallgate Thrii spec
20: GBE Performance Gap (Issue Paper) started from Loft insulation
20-21: Wrote and posted GBE Loft Insulation (Defects) G#14166
22: General Website pages update
23: Update LoftZone StoreFloor Robust Specification and page
24: To reduce repetition between many pages created GBE Robust Specifications (Terms Conditions Disclaimer Copyright) G#14220 to cross reference to
26-28: VAT and End of year Accounts
28: LoftZone StoreFloor (Method Statement) G#14281 and linking pages
28: Created Product Method Statement (Template) G#14276
29: Updating Page Lists
30: Created and Posted LoftZone StoreFloor (PASS) G#14333
30: Created Product Incubator (Template) G#14339
31: Created and Posted StoreFloor (Incubator) G#14348
31: BIM Jargon Buster Theme and Jargon Buster
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
23rd November 2016 – 16th January 2017