GBE > Blog > News > Diary > 2016 > G#10846
GBE Diary 2016 Q2
GBE Diary 2016 Q2 (This page); GBE Diary 2016 Q3 (Future); GBE Diary 2016 Q4 (Future)
GBE Diary 2015 Q4 (Archive); GBE Diary 2016 Q1 (Archive)
GBE Diary 2016 Q2
GBE Diary April 2016
1: Updated GBE Shop with Specification Writing with NBS Binder Disk service CPD Session 1 & 2 PPTX Slides, PDF Slides and handouts
1: TP Bennett Architects Elekta Site. Added revision tables to specs and issued drafts for review, prior to next Site Design Team Meeting
2: Updates and Additions added 62 pages for last weeks activity
3: Updates and Additions and Diary 2016 Q1 and added Diary 2016 Q2 (this page) update most of March and start of April 2016
6: Adrian James Architects: IVF Clinic in Harley Street London, 1st Specification meeting
7: TP Bennett Architects: Elekta Project: Crawley Site: Design Team meeting.
13: BIM4M2 seminar London Building Centre 13:30pm
14: LSBU Senior Lecturer in Architecture Job Interview
15: LSBU Lecture Re embodied and sequestered energy and carbon, in use energy consumption and carbon generation calculators
21: Ska & BCF meeting @ CPA @ Building Centre
22: LSBU Lecture
28: LSBU Studio Crits
29: Meeting Cara Jenkinson of Muswell Hill Sustainability Group London & Sarah Harrison of eco-refurbishment re September London event
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
3rd April 2016
GBE Diary 2016 Q2
GBE Diary May 2016
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:
15:
16:
17:
18:
19:
20:
21:
22:
23:
24:
25:
26:
27:
28:
29:
30:
31:
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
3rd April 2016 – 23rd November 2016
GBE Diary 2016 Q2
GBE Diary June 2016
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:
15:
16:
17:
18:
19:
20:
21:
22:
23:
24:
25:
26:
27:
28:
29:
30:
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
3rd April 2016 – 23rd November 2016