Skip to main content
search
0

GBE > Encyclopaedia > Design > G#3278

GBE Design Navigation

GBE Design Navigation
Index:


GBE RIBA Plan Of Work

Old version (A to M) for most smaller practices and general contracting

New (2013) version (0 to 8) for big projects and other procurement


0 Strategic Definition

1 Preparation & Briefing

  • B Design Brief
    • Employers Requirements
    • Set Performance targets
    • Performance Specification
    • Proposed Building Analysis
  • B Feasibility
    • Site Analysis
    • Existing Building Analysis

2 Concept Design

  • C Outline Proposal
    • Cost Plan Outline Specification
      • Elemental Performance
      • Services Systems Performance

3 Developed Design

  • D Scheme Design
    • 12 Scheme Design
      • Spacial Arrangements
      • Materials
      • Appearance
      • Elemental Assemblies
      • Coordination Specification

4 Technical Design

  • E Technical Design
    • Regulation Compliance
    • Calculations
    • Design to respond to calculations
    • Size & Thicknesses to match available
    • Coordination of Details
    • Interfaces
    • Detailed Specification

Beyond design

  • 4 Technical Design
    • F Production Information
      • Production Specification
      • Coordinated Production Information (CPI)
    • G Tender Documentation
      • Bill of Quantities/Schedule of Works
      • Tender Specification
    • H Tender Action
      • Multiple Package Specifications
      • Interface Coordination
      • Tender Evaluation
      • Contractor Specification Evaluation
  • 5 Construction
    • J Mobilisation
    • K Construction to Practical Completion
      • Inspection and checking on site
  • 6 Hand Over and Close Out
    • Wish-Lists
  • 7 In Use
    • L1 Post Practical Completion
      • Operation and maintenance manuals
      • As-buit Specification
    • L2-3 Aftercare
    • M Feedback
      • Post Occupation Evaluation (POE)
      • Wish List feedback Loops
  • 8 End Of Life
    • Product Passports
  • 9 Second Life

© GBE NGS ASWS BrianMurphy aka BrianSpecMan
24th September 2015 – 23rd September 2018

GBE Design Navigation
Images:


GBE RIBA Plan Of Work

RIBAPlanOfWork


Government Soft Landings (GSL)

SoftLandingsRIBAPofW

 


GBE CPD Specification at what stage?

Specification starts at the beginning and goes on all the way through

Specification starts at the beginning and goes on all the way through


© GBE NGS ASWS BrianSpecMan aka Brian Murphy
24th September 2015 – 24th April 2016

GBE Design Navigation
See Also:


 


© GBE NGS ASWS BrianSpecMan aka Brian Murphy
24th September 2015 – 24th April 2016

Close Menu