GBE > Encyclopaedia > Design > G#3278
GBE Design Navigation
Index:
GBE RIBA Plan Of Work
Old version (A to M) for most smaller practices and general contracting
New (2013) version (0 to 8) for big projects and other procurement
0 Strategic Definition
- Sustainability Aspiration
- Environmental Impact Assessment (EIA)
- Environmental Assessment Method (EAM) N#610
- A Inception
1 Preparation & Briefing
- B Design Brief
- Employers Requirements
- Set Performance targets
- Performance Specification
- Proposed Building Analysis
- B Feasibility
- Site Analysis
- Existing Building Analysis
2 Concept Design
- C Outline Proposal
- Cost Plan Outline Specification
- Elemental Performance
- Services Systems Performance
- Cost Plan Outline Specification
3 Developed Design
- D Scheme Design
- 12 Scheme Design
- Spacial Arrangements
- Materials
- Appearance
- Elemental Assemblies
- Coordination Specification
- 12 Scheme Design
4 Technical Design
- E Technical Design
- Regulation Compliance
- Calculations
- Design to respond to calculations
- Size & Thicknesses to match available
- Coordination of Details
- Interfaces
- Detailed Specification
Beyond design
- 4 Technical Design
- F Production Information
- Production Specification
- Coordinated Production Information (CPI)
- G Tender Documentation
- Bill of Quantities/Schedule of Works
- Tender Specification
- H Tender Action
- Multiple Package Specifications
- Interface Coordination
- Tender Evaluation
- Contractor Specification Evaluation
- F Production Information
- 5 Construction
- J Mobilisation
- K Construction to Practical Completion
- Inspection and checking on site
- 6 Hand Over and Close Out
- Wish-Lists
- 7 In Use
- L1 Post Practical Completion
- Operation and maintenance manuals
- As-buit Specification
- L2-3 Aftercare
- M Feedback
- Post Occupation Evaluation (POE)
- Wish List feedback Loops
- L1 Post Practical Completion
- 8 End Of Life
- Product Passports
- 9 Second Life
© GBE NGS ASWS BrianMurphy aka BrianSpecMan
24th September 2015 – 23rd September 2018
GBE Design Navigation
Images:
GBE RIBA Plan Of Work
Government Soft Landings (GSL)
GBE CPD Specification at what stage?
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
24th September 2015 – 24th April 2016
GBE Design Navigation
See Also:
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
24th September 2015 – 24th April 2016