GBE > Blog > News > Diary > 2015 > G#1766 N#1661
GBE Diary 2015 Q4
GBE Diary 2015 Q1 (Archive); GBE Diary 2015 Q2 (Archive); GBE Diary 2015 Q3 (Archive); GBE Diary 2015 Q4 (this page)
GBE Diary 2015 Q4
GBE Diary October 2015
1: Ska Higher Education Scheme Weighting
2: MailChimp Campaign
2: GBE Solution Provider News No1 November
3: GBE Members Newsletter No1 October
4: GBE Supporters Membership Benefits page
5: GBE Membership Campaigns: 150 Students and 900 Architects and update email address book
5: Added Google Analytics code onto GBE Website
6-11: UK Construction Week
Multi Show event NEC Birmingham rescheduled to bring together 9 shows
6-8: Build Show NEC
- Attending all 3 days to find interesting new products
9: Write up newsletters covering interesting products
10-15: GBE Address book: screening, cleaning, scanning, expanding, classifications before importing to MailChimp software
13: GBE Navigation Pages start here
15: HomePlanningHelp Interview Podcast summary editing
10 Insulation Types and When to Specify Them
15: GBE Address Book UKCW contacts scanning and MailChimp
16-19: GBE Members Newsletter No1 & No2 writing
17: UKCW page in website
19: Conference call WordPressNoStress about website editing
20-21: NGS Echo Confirmation of Manufacturers Self-Declaration for Anhydritec: Write up meeting notes; Desk study then Crewe Factory Visit with Alan Best Sustainability Peer Reviewer.
22: TGR Steering Group Meeting
22: BrianSpecMan spoke at TGR 15 year celebration Bristol
24: Project Logistics Architects specification proposal
24: Ecological Building Systems specification proposal
25: GBE Navigation Pages expansion
26: GBE Webstats from Google Analytics spreadsheet
26: GBE Newsletter Templates in MailChimp
28: GBE MailChimp Address Book Segmentation & Groups
29-31: GBE Innovation Statement for Paul Bourgeois for 100 Days, AECB
29: GBE Newsletters issued by MailChimp
30: GBE Webstats spreadsheet developed to Charts for GBE Sparklines
30: LSBU End of Year Assessment Dropbox
30: Marketing Compass monthly skype call
31: GBE Innovation Statement for Paul Bourgeois for 100 Days
31: GBE Website Q&A for WordPressNoStress
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
16th January 2015 – 25th November 2015
GBE Diary 2015 Q4
GBE Diary November 2015
1: GBE To Do List
1: GBE Webstats: More Sparkline Charts
2: GBE Robust Specifications: Proposals to Diasen, SipFit, Resistant & Enviroform
2: Book Review enquiry
2-3: NGS Echo Assessing Anhydritec manufacturers Self-Declaration under ISO 14021 scrutinising paperwork, visiting factory, storage facilities and transport. Writing Supporting Document.
4: GBE Checklist Navigation
4: GBE Robust Specifications emailing manufacturers
4: Reviewed Book Proposal for Tom Dollards follow up to ZCH’s builders book. Very Positive review with some cautions and suggestions.
4: Conference call with Renuables pre Horizon 2020 and CAPEM 9th-10th December events.
5: GBE Address Book update and screening Membership Groups and CPD providers for MailChimp import
6: GBE Issue Paper Overheating: update related pages
7: GBE Address Book update and screening Media, Magazines and Newsletters providers for MailChimp import
6-8: NGS Echo Certificate draft and Anhydritec manufacturing Flow Diagrams
8: Project Logistics Architecture: Specification Strategy proposal
8: Marketing Compass Q&A postings
9: Proposal to Paul Bourgeois to present to AECB Committee re Crowd Funding
10: NGS Echo: Report, survey images and manufacturing flow charts completed, issue to Anhydritec for confirmation.
11-12: GBE In-House CPD: G#4383 Specifications in the World of NBS Building
16: Enviroform Solutions‘ Liam Brown: planning meeting to develop GBE Robust Specifications for Solid Wall External Insulation details
17: Atteneded Built2Spec Horizon2020 Project Seminar & Public Consultation Workshop.
Met ECD Architects discussed Enviroform Solutions‘ External wall solutions and possible CPD.
18: Planning an in-house CPD at EDCA on Solid Wall External Insulation Details with Enviroform Solutions‘ Liam Brown
18: GBS Robust Specification Mailchimp Email campaign to Solution Providers
18: Contacted by Partel of Republic of Ireland planning a meeting to discuss GBE Robust Specifications
19: Adding more News links to GBE Home Page, Renamed NGS News to GBE Diary and updated
19: G#1064 N#1082 NGS Echo Collaborator Service: Client feedback on draft issue of certificate and report, conference call today from France.
Minor tweaks to layout, no change to content, xref between report and certificate.
20: Added Correspondence G#4721 Sacrosanct Specification
20: Growing and enhancing Navigation pages and rebuilding templates
- G#1766 N#1661 GBE Diary 2015 Q4
- G#1149 N#1154 GBE Manufacturer Page (T)
- G#1541 N#1484: GBE Daily Updates & Additions
- G#1085 N#1103 GBE Product Page Template (T)
- G#1223 N#1224 GBE Accessories Page Template (T)
- G#3769 GBE Page Templates Navigation
20: Demonstration G#4728 Enviroform Solutions Ltd. Company Page
21: Anhydritec NGS Echo: Certificate and Report completed, printed, bound signed and posted.
22: 8 hours uploading 2500 files to the G#7237 GBE Media Library
23: Co-ordinating and cross linking Page templates
- G#1085 N#1103 GBE Product Page Template (T)
- G#1223 N#1224 GBE Accessories Page Template (T)
- G#1151 N#1156 GBE System Page Template (T)
- G#1224 N#1225 GBE Elemental Assembly Page Template (T)
23: Promoting CIOB 1st December CPD event Zero Carbon Is It possible?
23: G#7282 CEEQUAL is dead, long live BRE CEEQUAL
23: GBE introduced ECD Architects to Marketing Compass‘s NT; meeting today to discuss developing Marketing Strategy
24: Mailchimp Campaign test GBE Solution Providers News No2
25-27: GBE Brainstorm: Desk study of a proposal for backland development single house; on a long narrow (one room and corridor wide) site between the bottoms of gardens between two north London terraces; potentially develop contract specification.
Considered 3 emailed design drawings, before meeting Architect. Prepared a 2 page analysis of proposal. Considered:
- wind access: restricted or not (assumptions with limited information)
- solar access: restricted or not (assumptions with limited information)
- urban heat island effect: potential influence
- tree locations: overshadowing, undermining, leaf drop blockages
- room functions:
- internal thermal, moisture and acoustic conditions
- relationship to open light and ventilation wells
- ability to resist solar gains
- risk of overheating and potential alleviation
- servicing strategy, structure, construction and services routing
- methods of construction and material choices
25: CRUK event today in London
25: NGS Echo Anhydritec: Report scope increased to cover for 4 countries and 4 materials.
26: Visited Project Logistics Architecture to:
- Their office is in one of their recent projects:
- an office attached to a factory which maintains and leases food grade artesian screws
- a great showcase of their lateral thinking and enabler of subtle culture change
- Discussed building physics and approaches to vapour permeability, vapour open/closed, hygroscopicity, moisture mass, decrement delay and appropriate material choices, products and manufacturers/suppliers on three projects:
- Solid wall historic refurbishment with extension,
- Extruded block wall new build,
- cavity wall extensions and roof alterations.
- Brainstormed healthy environmental appropriate, competent, effective construction methods and material choices for those three projects.
- Critiqued details and annotation on a set of design and working drawings.
- Explored developing a Practice Specification for new houses, alterations and extensions using NBS Scheduler and a specification template drawing.
- Will produce and outline schedule of Products and Suppliers following the meeting.
27: NGS Echo: Final Certificates and Report issued to Anhydritec
27: Downloaded Horizon 2020 schedule of project proposals looking for project partners to consider with Dr Andrew Norton of Renuables.
28: Diary and Daily updates
28: “Zero Carbon, is it possible?” CPD preparation for Tuesday
29: Project Logistics Architecture: After meeting notes and contact detail vCards emailed over
30: “Zero Carbon, is it possible?” CPD preparation for Tuesday and posting page with list of GBE CPD: Carbon seminars.
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
16th January 2015 – 3rd December 2015
GBE Diary 2015 Q4
GBE Diary December 2015
1: Project Logistics Architecture: After meeting notes added to and more contact detail vCards emailed over
1-3: Uploaded 1500 GBE CPD image files from NGS website to Media Library: Ready to reconnect many pages with 404 reports.
1: “Zero Carbon, is it possible?” CPD preparation for Tuesday adding image slides
1: CIOB CPD 18:00pm BrianSpecMan to present ‘Zero Carbon’
1-2: ArchitEx Architecture & Building Design Exhibition and Conference Liverpool
2: Uploaded CIOB event GBE CPD Files
2: New GBE CPD Navigation page and updated links
2: GBE Marketing Compass Conference Call
2-4: G#7794 Tabbed Product Page Template
3: Final edits of Ska HE GPM Good Practice Measures
3: Ska TC Technical Committee meeting rounding up Higher Education Scheme.
4: Summary of service provided to Architectural Practice related to 3 Projects, Building Performance and material choices and Office Specification templates: GBE Brainstorm: 3 Houses Case study
4-5: Added Testimonial Quotes around GBE website
4-6: Updated GBE Jargon Buster Collection merging in more terms to 451 pages, 7600 pieces of Jargon, Revision 49 ready for adding more to website. Uploaded PDF to website for downloads.
5: Added GBE CPD Navigation Pages About Specification
5: Relocated GBE CPD Navigation to CPD Refurbishment and Retrofit files.
6: Updated and linked files on Flood Jargon Buster Theme page
7: Call from Vitec expanding foam window perimeter insulation sealer
7-8: Developed GBE Tabbed Manufacturer Page Template
7: Updated specification pages Thermographic Survey, Performance Specification
7: Updated and posted Future Events 2015-2016 page
7: Posted free 2012 version 30 of Jargon Buster Collected (currently at version 49)
7: Updated AJ Special External Envelopes page
8: Meeting with Enviroform’s Liam Brown to discuss GBE Robust Specifications, preparing quotation.
8: End of project Report from IFORE Innovation FOr REnewal retrofit Interreg project links to Building Case Studies, Projects Information Case Studies, Project Event Case Studies
9: KTN Horizon 2020 project event London
Attending with Dr Andrew Norton or Renewables to consider future Nature-based project opportunities
9-10: CAPEM post-project team meeting to discuss future of CAPEM and CAPEM Compass
Follow up actions: Brief for new CAPEM Website followed by quotes
CAPEM Carbon Calculator Brief and exiting competition
10: Will not be attending SBEE Meeting in Cambridge whilst in France.
11: Catching up on email actions
11: Enviroform Go ahead
11: LSBU Lecturers Christmas Dinner
10-12: CAPEM replacement website brief and specification
13: G#8097 Product Data Templates
13: Added BIM PDS to Tabbed Product Page Template; later will add to Product Data Collection Schedules
14: Updated Tabbed Manufacturer and Product Page Templates and made PowerPoint GBE 6 Core pages showing Tabbed versions of pages
15: Updated Specification Liability PowerPoint and Page
15: Update Specification Workshop Calculator for half and whole day training workshop in 2016; updated GBE CPD About Specification
15: Discussing potential Practice Staff NBS Building Software training day
16: Relaying GREENPEACE campaign against Fracking Vote in parliament today (only a week after COP21 UK government appear to have caved in to big business and carbon makers) result this afternoon. Amazingly their seriously stupid ambition to permit fracking in water aquifer areas was abandoned but they permitted them to frack under AOB and SSSI. Think the fight is now on, I wonder if the ladies that habitually object to wind turbine planning applications will be out there blocking the drilling lorry paths. I do hope so. CPRE, Ramblers, Womens Institute and National Council of Women, your moment is now.
16: Big welcome to CAPEM Group Europe on twitter @capem_eu and brushed up CAP’EM pages
16-17: GBE Product Data Collection Sheet update
GBE Incubator Product Schedule is first part done
16: GBE Q&A From Architect to Specifier
16: G#8280 GBS Specification In Practice Shrewsbury School in Pictures
17: Extending Navigation pages to Accessories Navigation in M20, M21 for Enviroform’s Accessories.
Extending Navigation pages to Product Navigation to Assembler for Enviroform Solutions Ltd.
17-18: Started updating GBE Product Data Collection excel file to deliver to all tabs in Tabbed Product Page Template (incomplete)
18: Confirmed contract to deliver Lectures to Part 2 Architecture course Energy & Resource Efficiency In Design Module starting February 2016
18: Created G#8356 Tabbed Accessory Page Template (in development) ready for Enviroform Solutions Accessories
19: Adding and updating Image sliders to Navigation pages
19-22: VAT Accounts & Annual Accounts
21-22: Updating Navigation pages and Others Stuff Navigation
23: Mailchimp GBE Solution Provider News No2 December 2015 update and issued to >600
23: GBE In-house CPD updates and added image slider
23: Mailchimp GBE Members Newsletter No.2 December 2015 updated and issued to >1500
24: Other’s Newsletters update
24-27: LSBU London South Bank University Pull time Posts: Job Applications form filling
25: Day off
26: Updated Supporter Membership Benefits, 3D View, 2D View CPD Slide Graphics & PASS Serve
27: SEO upgrades on many pages
28: Development of Tabbed Manufacturer Page Template to replace Enviroform Solutions Ltd. Page links to Refurbishment CPD
28: Development of Tabbed Accessory Page Template to add Enviroform’s solutions
29: Created PNG images from Enviroform Solutions literature, imported to Media Library, then posted into Tabbed Accessory Page Template
30-31: Final editing of Tabbed Accessory Page Template and Enviroform Solutions Ltd. Page; updated WordPress Template; created 5 new Accessory Pages from template and edited each Thermo-Bead, Thermo-Pro Soil Pipe, Thermo-Pro Fascia, Thermo-Flash, Thermo-Trac; then in page SEO update; Add images to top right; Add Classification information; Updated Template.
31: LSB University Job Application forms
31: Marketing action discussions with Marketing Compass
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
16th January 2015 – 2nd February 2016