GBE K43 Raised Storage Access Systems (Checklist)
Tabs with * indicates the tab contains specific information for this checklist topic
- * 1 Problems/Solutions
- * 2 Consider/Avoid
- * 3 Health/Environmental
- * 4 Resourceful
- * 5 Install/Use/Maintenance
- * 6 Waste issues:
- * 7 End of Life
- * 8 Jargon Buster
- * 9 Checklist
- * 10 CPD/Lectures
- 11 Case Studies
- 12 Projects
- * 13 Calculators
- * 14 Products
- * 15 Accessories
- * 16 Systems
- * 17 Images
- * 18 All
- * 19 HERACEY™
- * 20 Slogan/Hashtag
GBE K43 Raised Storage/Access Systems (Checklist)
Problems/Solutions:
1 Problems/Solutions
Issues:
- 80% of domestic lofts are used for essential but infrequently used possessions and belongings storage like camping gear and Christmas decorations, and their insulation is often squashed under these possessions.
- Squashed insulation’s performance is worse than halved, and heat loss is more than doubled through squashed insulation.
- Extreme energy efficiency upgrades often need whole house ventilation or heat and ventilation systems and renewable energy systems, parts of which occupy parts of the loft.
- Services inevitably have access or inspection panels to replaceable parts like filters, they need safe access routes to enable easy maintenance and say a 1m2 working platform at the access panel, with room to open and withdraw parts.
- MVHR units require a safe access platform and a minimum 1m2 working deck.
- Many boiler maintenance companies will not attend to a boiler in a loft unless there is a safe access platform.
GBE Issue Paper:
- Squashed Loft Insulation G#13919
Problems:
- Personal possessions and belonging being stored in lofts is a significant barrier to upgrading the loft insulation or services systems to current needs or current regulations.
- Decanting of possessions from roof and replacing them after the job is another point of expenditure where profits cannot be made so was a discouragement for energy refurbishments.
- Recent stories in the media about tradesmen steeling heirlooms from lofts whilst working, puts more people off upgrading their insulation.
Misunderstandings:
- 48% of families surveyed do not understand that squashing insulation reduces its performance.
Solutions:
- Manufacturers now make raised storage and access systems that are suitable for DIY installation overcoming the issue of theft by tradesmen.
- They are modular so that parts can be assembled and possessions moved onto the partial storage deck.
- More of the modules are completed where the possessions were, gradually creating all the modules and raising all of the possessions in stages
Q&A:
Brainstorm:
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
2001 – 9th December 2016 – 15th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
Consider/Avoid:
Consider:
- Co-ordinate the planning of storage and access platforms with the Services installations to acknowledge the module sizes as much as possible
- Ensure access panel opening geometry, working space, and replacement parts withdrawal and replacement
Substitute:
- If you choose a BBA certified system specify it or an inferior system may get substituted
Minimise:
- Cutting of modular components by avoiding obstruction, plan to only use whole units and avoid cutting at edges
Avoid:
- Solid or hollow and closed legs that create thermal bridges through the top-up insulation
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 10th June 2018
GBE K43 Raised Storage/Access Systems (Checklist)
Health/Environmental
Health:
Take care if removing or moving existing old thermal insulation where all appropriate personnel protective equipment (PPE)
Wellbeing:
If the loft is insulated what materials are used?
Replace rockwool, stonewool, glasswool, glass fibre, polystyrene, foamed plastics, with dense wood fibre, medium density flexible wood fibre, cellulose fibre, cork, cellular glass; to avoid overheating.
Biophilia:
Consider a visible veneered plywood or veneered block-board in place of chipboard
Biodiversity:
Take care not to disturb any birds or bats found in the lofts.
£5000/bat fine for disturbing, excluding, entrapping bats
Safety:
Take precautions when lifting components into lofts and ensure all parts do not risk sliding back down
Working in a loft is equivalent to working at height,
200 falls through ceilings or from lofts, that result in hospital visits occur each year.
Services inevitably have access or inspection panels to replaceable parts like filters, they need safe access routes to enable easy maintenance and say a 1m2 working platform at the access panel, with room to open and withdraw parts.
MVHR units require a safe access platform and a minimum 1m2 working deck.
Many boiler maintenance companies will not attend to a boiler in a loft unless there is a safe access platform.
Precautionary principle:
Adopt working at height precautions and PPE requirements.
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 10th June 2018
GBE K43 Raised Storage/Access Systems (Checklist)
4 Resourceful:
Resource Efficiency:
Resource Efficiency Issues:
- Choose a system that is modular, prefabricated, easy to handle, quick and easy to assemble, effective, adaptable to older irregular roofs
- Do not choose preassembled
Industry/Sector/Company Initiatives:
- Some manufacturers offer return to stock
Reduce:
- Plan the installation in advance and only order what is needed, some manufacturers offer return to stock
Reclaim:
- Removal of screws from all components permits their easy retrieval, reclaim and reuse
Reuse:
- Reuse reclaimed parts in similar arrangement.
Recycle:
- Screws retrieved from steel components may not be reusable in which case, segregate them for recycling
Recover:
- Better not to burn plastics, chipboard, polyethylene because of the chemicals release;
- Paper or cardboard is less of a problem,
- but its best to segregate and reuse them all
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 10th June 2018
GBE K43 Raised Storage/Access Systems (Checklist)
5 Install/Use/Maintenance
Install
- Ensure any existing top-up insulation is moved away to allow setting out and installation of raised storage/access systems
- Ensure the top-up insulation is moved back into place to fill the gaps between supports and most importantly surround the supports
- Ensure a 50 mm air space for cross ventilation is maintained between top of insulation and bottom of storage/access deck
- Provide and follow Method Statement
In Use Issues:
- Check timber based board is not suffering from surface condensation on the underside and remaining damp
Maintenance Issues:
- Metal, plastic and timber parts should not need maintenance
- Services inevitably have access or inspection panels to replaceable parts like filters, they need safe access routes to enable easy maintenance and say a 1m2 working platform at the access panel, with room to open and withdraw parts.
- MVHR units require a safe access platform and a minimum 1m2 working deck.
- Many boiler maintenance companies will not attend to a boiler in a loft unless there is a safe access platform.
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
10th December 2016 – 15th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
6 Waste issues:
Hazardous waste:
None anticipated unless asbestos based insulation is found in the existing ceiling insulation
Deleterious Substances:
- None anticipated expect if glued joints are part of system
- Avoid unnecessary painting any component
Waste management:
- Design to avoid waste using modular system in modular arrangment
Waste statistics:
Waste minimization:
- One manufacturer offers Return to Stock
European Waste Catalogue:
- 15 01 01 paper and cardboard packaging
- 17 02 01 wood (decking and pallets)
- 17 02 03 plastic (supports)
- 17 04 04 zinc (galvanizing)
- 17 04 05 iron and steel (cross-beams)
- 17 04 07 mixed metals (galvanized steel cross-beams, screws)
- 17 06 INSULATION MATERIALS AND ASBESTOS-CONTAINING CONSTRUCTION MATERIALS
- 17 06 01* insulation materials containing asbestos (not applicable unless existing)
- 17 06 03* other insulation materials consisting of or containing DS (not applicable unless existing)
- 17 06 04 insulation materials other than those mentioned in 17 06 01 and 17 06 03 (thermal insulation)
- 17 08 GYPSUM-BASED CONSTRUCTION MATERIALS
- 17 08 01* gypsum-based construction materials contaminated with DS (not applicable)
- 17 08 02 gypsum-based construction materials other than those mentioned in 17 08 01 (in case of accidents)
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
21st January 2016
GBE K43 Raised Storage/Access Systems (Checklist)
7 End of Life:
End of Life Options:
- Removal of screws from all components permits their easy retrieval, reclaim and reuse
Deconstruction:
- Removal of screws from all components permits their easy retrieval, reclaim and reuse
Demount ability:
- Removal of screws from all components permits their easy retrieval, reclaim and reuse
Reclaim:
- Reclaim all of the parts for reuse
Product Passport:
- None offered yet
Remanufacture:
- None required if removed carefully
Recycle:
- Recycle unserviceable screws damaged by driving into steel sections
Make available for Reuse:
Reuse:
- Reassemble following manufacturers installation instructions
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 10th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
Jargon Buster:
GBE Jargon Buster
Initial, Abbreviations & Acronyms
- K43 Raised Storage/Access Systems (GBS addition to CAWS)
- Conduction Thermal Insulation
- Decrement Delay
- k value
- Loft
- Loft Insulation
- Radiant Thermal Insulation
- Raised storage/access systems
- Thermal Break
- Thermal Bridge
- Thermal Bypass
- Thermal Flanking
- Thermal Insulation
- U value
Numbers:
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 2nd April 2017
GBE K43 Raised Storage/Access Systems (Checklist)
Checklist:
GBE Checklist(s)
New Build:
- New homes rarely have raised storage/access platforms above thick thermal insulation,
- 80% of households regarding loft storage as essential,
- Retrofitting raised storage/access platforms is one of the first actions after moving in.
Refurbishment:
- Loft insulation should be an obvious choice in any refurbishment
Decent Homes:
- Loft insulation should be an obvious choice in any refurbishment
- Insulation should come before replacement of old boiler with efficient boiler or old heating system with new
GreenDeal/ECO:
- Insulation will always meet the Golden Rule with a short payback period
- Some of the many reasons for poor uptake of energy refurbishments:
- Loss of loft storage after loft top-up insulation
- Decanting of possessions from loft space to increase insulation
Adaptation:
- Don’t just use k-value conductivity thermal insulation
- We must protect homes from summer solar radiation heat gains through opaque roofs
- 20% of homes already overheat (ZCH 2015)
Lifestyle:
- Insulate your house as a priority
- New bathrooms and kitchens cost you money that will only be realized when you sell and move on
- Insulation saves you money whilst you stay put
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 10th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
10 CPD/Lectures:
GBE CPD
Topics
-
Refurbishment
-
Housing
- Loft Insulation Top-up
-
Non-Domestic
-
GreenDeal
- Overheating-retrofit Insulation
- Avoiding Decanting Possessions to insulate loft
Seminars
- Manufacturer’s CPD
- LoftZone-cpd-training PDF Show
GBE Lectures
Theme
-
Elemental
- (27.2) Pitched Roofs (Lecture) G#2122 N#224
- GBE Lecture (27.2) Pitched Roofs (Shop) G#11500
Subjects
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 2nd April 2017
GBE K43 Raised Storage/Access Systems (Checklist)
11 Case Studies:
GBE Case Studies
Buildings
Portfolio
Events
- Overheating
Information
GBE Evidence Based Case
Buildings
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 15th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
12 Projects:
GBE Projects
Events
Information
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 10th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
13 Calculators:
GBE Calculators
GBE Equations
GBE Datasets
GBE Product Data Sheets
GBE Calculators
- The Loft Insulation U value and Raised Storage/Access System Psi value calculator is complete and reviewed by the manufacturer it was created for
- It needs to be Peer Reviewed before making it available here.
- But you can have a glimpse of the cover sheet and part of the main calculator until then.
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 10th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
14 Products:
GBE Products
- StoreFloor Uni-Support
- StoreFloor Tri-Support
- StoreFloor Cross-beam
Making up System
- StoreFloor G#13287
GBE Manufacturer
- Eco Answers Ltd t/a LoftZone G#13890
GBE Robust Specification
- GBS K43 120A StoreFloor (RSW) G#14031
GBE Shop
- GBS K43 120A StoreFloor (Shop) G#14037
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 28th December 2016
GBE Issue Paper: Title; Subtopic: Name
15 Accessories:
GBE Accessories
Primary Thermal Insulation
Top-up Insulation
Timber panel products
Screws
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 10th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
Systems:
GBE Systems
- StoreFloor G#13287
GBE Manufacturer
- Eco Answers Ltd t/a LoftZone G#13890
GBE Robust Specification
- GBS K43 120A StoreFloor (RSW) G#14031
GBE Shop
- GBS K43 120A StoreFloor (Shop) G#14037
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 28th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
Images:
GBE 2D & 3D CAD (See GBE Images below)
GBE CPD
-
CPD Covers
-
CPD Slides
-
CPD Shows
-
CPD Handouts
GBE Images
-
3D images
Sequential build up of LoftZone StoreFloor Loft Access/Storage Decking
Uninsulated Loft Ceiling
Inadequately insulated Loft Ceiling (Insulation is laid in depth of ceiling joists)
LoftZone StoreFloor supports and crossbeams bearing on ceiling joists
Loft Deck boards bearing on LoftZone StoreFloor Cross beams (partial installation)
Loft Deck boards bearing on LoftZone StoreFloor Cross beams (complete installation)
Possessions on the LoftZone StoreFloor deck and no squashed loft Insulation
3D CAD file available in SketchUp 3D and AutoCAD DWG formats
Line Drawing of 3D CAD file
-
Icons
-
Logos
- https://uk.pinterest.com/loftzone/?etslf=7362&eq=loftzone
- https://uk.pinterest.com/loftzone/loftzone-installers/
Videos
- Youtube https://www.youtube.com/user/LoftZoneStoreFloor
- Training course: http://www.pplelearning.co.uk/lms/index.php?r=course/details&id=18
GBE Checklist
GBE Checklist K43 A04BRM151216 PDF
GBE Robust Specification
GBE Issue Paper
GBE IssuePaper-SquashedLoftInsulation a03 brm 081216 PDF
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 2nd April 2017
GBE K43 Raised Storage/Access Systems (Checklist)
18 All:
GBE Checklist K43 A04BRM151216 This page as a PDF
K43 RAISED STORAGE/ACCESS SYSTEMS (Checklist)
1 Problems/Solutions
Issues:
80% of domestic lofts are used for essential but infrequently used possessions and belongings storage like camping gear and Christmas decorations, and their insulation is often squashed under these possessions.
Squashed insulation’s performance is worse than halved, and heat loss is more than doubled through squashed insulation.
Extreme energy efficiency upgrades often need whole house ventilation or heat and ventilation systems and renewable energy systems, parts of which occupy parts of the loft.
Services inevitably have access or inspection panels to replaceable parts like filters, they need safe access routes to enable easy maintenance and say a 1m2 working platform at the access panel, with room to open and withdraw parts.
MVHR units require a safe access platform and a minimum 1m2 working deck.
Many boiler maintenance companies will not attend to a boiler in a loft unless there is a safe access platform.
GBE Issue Paper:
Squashed Loft Insulation G#13919
Problems:
Personal possessions and belonging being stored in lofts is a significant barrier to upgrading the loft insulation or services systems to current needs or current regulations.
Decanting of possessions from roof and replacing them after the job is another point of expenditure where profits cannot be made so was a discouragement for energy refurbishments.
Recent stories in the media about tradesmen steeling heirlooms from lofts whilst working, puts more people off upgrading their insulation.
Misunderstandings:
48% of families surveyed do not understand that squashing insulation reduces its performance.
Solutions:
Manufacturers now make raised storage and access systems that are suitable for DIY installation overcoming the issue of theft by tradesmen.
They are modular so that parts can be assembled and possessions moved onto the partial storage deck.
More of the modules are completed where the possessions were, gradually creating all the modules and raising all of the possessions in stages
Consider:
Co-ordinate the planning of storage and access platforms with the Services installations to acknowledge the module sizes as much as possible.
Ensure access panel opening geometry, working space, and replacement parts withdrawal and replacement
Substitute:
If you choose a BBA certified system specify it or an inferior system may get substituted
Minimise:
Cutting of modular components by avoiding obstruction, planning to whole units and avoiding cutting at edges
Avoid:
Solid or hollow and closed legs that create thermal bridges through the top-up insulation
Health:
Take care if removing or moving existing old thermal insulation where all appropriate personnel protective equipment (PPE)
Wellbeing:
Biophilia:
Consider a visible veneered plywood or veneered block-board in place of chipboard
Biodiversity:
Take care not to disturb any birds or bats found in the lofts.
£5000/bat fine for disturbing bats
Safety:
Take precautions when lifting components into lofts and ensure all parts do not risk sliding back down
Working in a loft is equivalent to working at height,
200 falls through ceilings or from lofts, that result in hospital visits occur each year.
Services inevitably have access or inspection panels to replaceable parts like filters, they need safe access routes to enable easy maintenance and say a 1m2 working platform at the access panel, with room to open and withdraw parts.
MVHR units require a safe access platform and a minimum 1m2 working deck.
Many boiler maintenance companies will not attend to a boiler in a loft unless there is a safe access platform.
Precautionary principle:
Adopt working at height precautions and PPE requirements.
4 Resource Efficiency Issues:
Choose a system that is modular, prefabricated, adaptable to older irregular roofs, not preassembled, easy to handle, quick and easy to assemble, effective.
Industry/Sector/Company Initiatives:
Some manufacturers offer return to stock
Reduce:
Plan the installation in advance and only order what is needed, some manufacturers offer return to stock
Reclaim:
Removal of screws from all components permits their easy retrieval, reclaim and reuse
Reuse:
Reuse reclaimed parts in similar arrangement.
Recycle:
Screws retrieved from steel components may not be reusable in which case, segregate them for recycling
Recover:
Better not to burn plastics, chipboard, polyethylene because of the chemicals release;
paper or cardboard is less of a problem,
but its best to segregate and reuse them all
5 Install/Use/Maintenance
Install
Ensure any existing top-up insulation is moved away to allow setting out and installation of raised storage/access systems
Ensure the top-up insulation is moved back into place to fill the gaps between supports and most importantly surround the supports
Ensure a 50 mm air space for cross ventilation is maintained between top of insulation and bottom of storage/access deck
Provide and follow Method Statement
In Use Issues
Check timber based board is not suffering from surface condensation on the underside and/or remaining damp
Maintenance
Metal, plastic and timber parts should not need maintenance
Services inevitably have access or inspection panels to replaceable parts like filters, they need safe access routes to enable easy maintenance and say a 1m2 working platform at the access panel, with room to open and withdraw parts.
MVHR units require a safe access platform and a minimum 1m2 working deck.
Many boiler maintenance companies will not attend to a boiler in a loft unless there is a safe access platform.
6 Waste Issues:
Hazardous waste:
None anticipated unless asbestos based insulation is found in the existing ceiling insulation
Deleterious Substances:
None anticipated expect if glued joints are part of system
Avoid unnecessary painting any component
Waste management:
Design to avoid waste using modular system in modular arrangement
Waste statistics:
Waste minimization:
One manufacturer offers Return to Stock
European Waste Catalogue:
15 01 01 paper and cardboard packaging
17 02 01 wood (decking and pallets)
17 02 03 plastic (supports)
17 04 04 zinc (galvanizing)
17 04 05 iron and steel (cross-beams)
17 04 07 mixed metals (galvanized steel cross-beams, screws)
17 06 INSULATION MATERIALS AND ASBESTOS-CONTAINING CONSTRUCTION MATERIALS
17 06 01* insulation materials containing asbestos (not applicable unless existing)
17 06 03* other insulation materials consisting of or containing DS (not applicable unless existing)
17 06 04 insulation materials other than those mentioned in 17 06 01 and 17 06 03 (thermal insulation)
17 08 GYPSUM-BASED CONSTRUCTION MATERIALS
17 08 01* gypsum-based construction materials contaminated with DS (not applicable)
17 08 02 gypsum-based construction materials other than those mentioned in 17 08 01 (in case of accidents)
7 End of Life
End of Life Options:
Removal of screws from all components permits their easy retrieval, reclaim and reuse
Deconstruction:
Removal of screws from all components permits their easy retrieval, reclaim and reuse
Demount ability:
Removal of screws from all components permits their easy retrieval, reclaim and reuse
Reclaim:
Reclaim all of the parts for reuse
Product Passport:
None offered yet
Remanufacture:
None required if removed carefully
Recycle:
Recycle unserviceable screws damaged by driving into steel sections
Make available for Reuse:
Reuse:
Reassemble following manufacturers installation instructions
8 Jargon Buster
GBE Jargon Buster
Initial, Abbreviations & Acronyms
Classification
- K43 Raised Storage/Access Systems
- Conduction Thermal Insulation
- Decrement Delay
- k value
- Loft
- Loft Insulation
- Radiant Thermal Insulation
- Raised storage/access systems
- Thermal Break
- Thermal Bridge
- Thermal Bypass
- Thermal Flanking
- Thermal Insulation
- U value
Numbers:
9 Checklist:
New build:
New homes rarely have raised storage/access platforms above thick thermal insulation,
80% of households regarding loft storage as essential,
Retrofitting raised storage/access platforms is one of the first actions after moving in.
Refurbishment:
Loft insulation should be an obvious choice in any refurbishment
Decent Homes:
Loft insulation should be an obvious choice in any refurbishment
Insulation should come before replacement of old boiler with efficient boiler or old heating system with new
GreenDeal/ECO:
Insulation will always meet the Golden Rule with a short payback period
Some of the many reasons for poor uptake of energy refurbishments:
Loss of loft storage after loft top-up insulation
Decanting of possessions from loft space to increase insulation
Adaptation:
Don’t just use k-value conductivity thermal insulation
We must protect homes from summer solar radiation heat gains through opaque roofs
20% of homes overheat (ZCH 2015)
Lifestyle:
Insulate your house as a priority
New bathrooms and kitchens cost you money that will only be realized when you sell and move on
Insulation saves you money whilst you stay put
10 CPD/Lectures
GBE CPD
- Refurbishment
- Housing
- Non-Domestic
- GreenDeal
- Overheating retrofit insulation
- 80% of loft insulation is not working
GBE Lectures
Theme
- Elemental
- Pitched roofs
- (27.2) Pitched Roofs (Lecture) G#2122 N#224
- GBE Lecture (27.2) Pitched Roofs (Shop) G#11500
Subjects
11 Case Studies:
GBE Case Studies
Portfolio
- Overheating
GBE Evidence Based Case
Buildings
12 Projects:
GBE Projects
13 GBE Calculators
GBE Equations
GBE Datasets
GBE Product Data Sheets
GBE Calculators
- The Loft Insulation U value and Raised Storage/Access System Psi value calculator is complete and reviewed by the manufacturer it was created for.
- It needs to be Peer Reviewed before making available here.
- But you can have a glimpse of the cover sheet and part of the main calculator until then.
14 Products
GBE Products
- StoreFloor Uni-Support
- StoreFloor Tri-Support
- StoreFloor Cross-beam
Making up System
StoreFloor G#13287
GBE Manufacturer
Eco Answers Ltd t/a LoftZone G#13890
GBE Robust Specification
- GBS K43 120A StoreFloor (RSW) G#14031
GBE Shop
- GBS K43 120A StoreFloor (Shop) G#14037
15 Accessories
GBE Accessories
Primary Thermal Insulation
Top-up Insulation
Timber panel products
Screws
16 Systems
GBE Systems
StoreFloor G#13287
GBE Manufacturer
Eco Answers Ltd t/a LoftZone G#13890
GBE Robust Specification
- GBS K43 120A StoreFloor (RSW) G#14031
GBE Shop
- GBS K43 120A StoreFloor (Shop) G#14037
17 Images
GBE CPD
- CPD Covers
- LoftZone CPD Cover slide
- CPD Slides
- CPD Shows
- CPD Handouts
GBE Images
- Icons
- Logos
- https://uk.pinterest.com/pin/523543525416166053/
Videos
- Youtube https://www.youtube.com/user/LoftZoneStoreFloor
- Training course: http://www.pplelearning.co.uk/lms/index.php?r=course/details&id=18
18 All
19 HERACEY™
Healthy:
- Use low VOC adhesive timber panels boards
- Use High decrement delay radiant heat thermal insulation to reduce risk of overheating
Environmental:
- Use plant based top-up thermal insulation with GWP in minus figures
Resourceful:
- Use a Modular system, design a modular layout, cut nothing, waste nothing
Appropriateness:
- Systems designed for this purpose are appropriate
Competence:
- One system on the market is BBA Certified as competent for the job
- k-value is not enough to overcome summer solar heat gain, decrement delay is essential too
Effectiveness:
- Raising possessions up from loft insulation makes a significant difference to insulation performance
- Use blown-in or poured-in insulation to reduce risk of gaps in insulation around supports
- Use high decrement delay plant based insulation, effective against summer solar heat gain and winter conductivity heat loss
Yardstick:
Use a BBA Certified System
20 Slogan/Hashtag
Slogan:
Stuffed Loft – Flat Insulation – Lift Your Loft Stuff (Slogan) G#13957
#Hashtag:
#LiftYourLoftStuff (Hashtag) G#13957
21 Information sources:
See this page right column
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 15th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
19 HERACEY™:
Healthy:
- Use low VOC adhesive timber panels boards
- Use High decrement delay radiant heat thermal insulation to reduce risk of overheating
Environmental:
- Use plant based top-up thermal insulation with GWP in minus figures
Resourceful:
- Use a Modular system, design a modular layout, cut nothing, waste nothing
Appropriateness:
- Systems designed for this purpose are appropriate
Competence:
- One system on the market is BBA Certified as competent for the job
- k-value is not enough to overcome summer solar heat gain, decrement delay is essential too
Effectiveness:
- Raising possessions up from loft insulation makes a significant difference to insulation performance
- Use blown-in or poured-in insulation to reduce risk of gaps in insulation around supports
- Use high decrement delay plant based insulation, effective against summer solar heat gain and winter conductivity heat loss
Yardstick:
- Use a BBA Certified System
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
10th December 2016
GBE K43 Raised Storage/Access Systems (Checklist)
20 Slogan/Hashtag:
Slogan:
- Stuffed Loft – Flat Insulation – Lift Your Loft Stuff (Slogan) G#13957
#Hashtag:
- #LiftYourLoftStuff (Hashtag) G#13957
© GBE NGS ASWS Brian Murphy BrianSpecMan
11th December 2016 – 15th December 2016
© GBE NGS ASWS BrianSpecMan aka Brian Murphy
9th December 2016 – 2nd April 2017