Skip to main content
search
0

GBE Manufacturer Services Costs G#671 N#693

By 4 May 2014December 27th, 2018Uncategorized

ABOUTPAGES > MANUFACTURER /SUPPLIER > G#671 N#693

GBE Manufacturer Services Costs

GBE Manufacturer Services Costs
About: 


GBE SERVICES on offer are comprehensive and aim to be joined up from the outset, manufacturers can be selective initially and can progress towards a more comprehensive and joined up set of parts. (Fig. 1 & 2)

Manufacturers information needs to be free to designers and specifiers to download so there is an inevitable charge to the manufacturer for these services but they are as low as we can keep them.

GBE has developed a service that is a combination of many small low cost elements whose prices are set and calculable, there is a calculator to download for you to add your shopping list to determine the total cost, add or subtract services to find a price that suits your budget. (Fig. 3)

GBE assumes the success of this services is based on the number of the documents downloaded; the specification being the most important document of all because it incorporates all of the important requirements of all the other documents and it ends up in the project contract and generates actual sales. (Fig. 5)

If you have a different criteria for judging success please let GBE know.

GBE is experimenting with providing a minimum service on credit (price determined and informed in advance) until it proves to be working (document downloads; 1 or 2 weeks is enough to know) once the services if proved then the manufacturer pays for the minimum service in full, and GBE shows the manufacturer what can be added to increase the likely document downloads which the manufacturer can choose to commission or not. (Fig. 3)

GBE is also going to experiment with half payment and remainder in installments, this will only be offered to Micro SMEs and not available to SME Small to Medium Enterprises.

The initial payment for setting up being set by GBE price and your scope, and this price is for one year.

Subsequently GBE is considering GBE will report on webstats based on document downloads alone, and invite the manufacturer to pay what they think the service is worth to them (GBE assume the more downloads the better the more its worth) if the service is not benefiting the manufacturer then the pages will be removed and no further money is exchanged.

It is in GBE’s interest to optimise the manufacturer’s pages to maximise the downloads and GBE will.

GBE MANUFACTURER SERVICE COSTS CALCULATOR

Contact GBE


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
30th December 2012 – 27th December 2018

GBE Manufacturer Services Costs
Images:


NGS 6 Part Linkage Diagram 1 png

Fig. 1 GBE 6 CORE PAGES are paid for by or shared between manufacturer, supplier and installer

NGS Manufacturer Service Diagarms A00 BRM 031213 png

Fig. 2 Further embellishment, linking and enrichment activity is carried out by GBE continuously to improve the accessibility and usefulness of the website for the users

NGS Manufacturer Supplier Services Excel A00 png

Fig. 3 Manufacturer Services Schedule Cost Calculator (Excel)

NGS Product Page Example Costs A00 BRM 200414 png

Fig 4. Product Page Cost Examples

Download Webstats 011213 png

Fig. 5 GBE WEBSTATS Total Document Download Report Sheet

NGS Downloads Gemini Webstats 200414 png

Fig. 6 GBE 1 Manufacturers Document Download Report sheet

NGS 6 Core Pages 4 wide png

Fig. 7: 6 CORE PAGES (PDF)


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
2nd December 2013 – 27th December 2018

GBE Manufacturer Services Costs
See Also: 


Is this website being used?

What services are on offer?

What are the costs of services on offer?

Who can I discuss my requirements with?


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
2nd December 2013 – 27th December 2018

Leave a Reply

Close Menu