Skip to main content
search

A90 Performance Specification (Checklist) G#1715 N#1617

By 13 December 2014August 26th, 2019Uncategorized

GBE > Design > Code > Checklist > New build > A > G#1715 N#1617

A90 Performance Specification Checklist

A90 Performance Specification Checklist
About:

Index:


Problems:

  • Very rarely the design life of a building is established in the briefing process
  • If you assume the building is designed for a ’60 year Normal life’ then this dictates we build competently and robustly, if you assume a ’15 years temporary life’ the materials and methods can change, being less robust.

Misunderstandings:

  • If the client acknowledges that some part of a fit-out have a short life because the space is likely to be refitted for another purpose within a short period then the materials and methods used should reflect this this short life; then requirements for 25 year guarantees on everything are inappropriate in those cases

Solutions:


Consider:

Design structure for appropriate life:

  • 15 year Temporary, 30 year Short Life, 60 year Normal life, 120 year Long life
  • But rationalise and design the structure and fabric to allow replacement of shorter life elements
  • Design frame and fabric for deconstruction and salvage in future at end of design life
  • Ensure durable structural elements can be reused or recycled
  • Ensure mechanical connections are robust to allow disconnection and reassembly
  • Ensure components are robust enough to cope with manhandling and transport to reuse site

Avoid:


Minimise:


Value Engineering:
(looking at the bigger picture)
(getting stuff into projects not out of them)


Substitute:


Health:


Wellbeing:


Safety:

Precautionary principle:


Resource Efficiency:


Reduce:


Reclaim:


Reuse:


Recycle:


Recover:


Waste Issues:


Waste Category:


Hazardous waste:


Waste statistics:


End of Life options:


Appropriateness:


Competence:


Effectiveness:


Yardstick:


Maintenance issue:


Information sources:


© GBE NGS ASWS Brian Murphy aka BrianSpecMan *
13th December 2014 – 26th August 2019

A90 Performance Specification Checklist
Images: 


A90PrinciplesOfElementDesign_Page_1.png

GBE CPD: Book: Principles of Element Design

GBS J A90 Perf Spec CPD P32 png

GBE Books: Principles of Element Design: showing
Performance Drawing and Prescriptive Drawing

GBS J A90 PerfSpec CPDCover png

GBE CPD: GBS J A90 Performance Specification: cover slide

A90PrinciplesOfElementDesign_Page_3.png

GBE CPD: GBS J A90 Performance Specification:
Slice 2: Educational Objective 

GBS J A90 Perf Spec CPD P25 png

GBE CPD: GBS J A90 Performance Specification
Slide x: The relationship between A90 and B03 & B04

A90PrinciplesOfElementDesign_Page_2.png

GBE CPD: Air Movement on Building
Page 2: Topics in Series of 24 Seminars


If you wish to reproduce images, feel free, but please acknowledge the source.


© GBE NGS ASWS Brian Murphy aka BrianSpecMan *
13th December 2014 – 26th August 2019

A90 Performance Specification Checklist
See Also: 


GBE Checklist

New Build


GBE Jargon Buster

Theme

  • Or Equivalent

GBE CPD

Seminar Topic Group

  • Seminar

GBE Links

  • Organisation/Website

GBE Elemental Assemblies


GBE Calculators


GBE CAD

  • 2D and 3D SketchUp Product files
  • SketchUp files of Construction Sections

GBE Green Building Specification

GBE Robust Specification

  • Robust Specification Clause
  • Robust Specification Work Section

© GBE NGS ASWS Brian Murphy aka BrianSpecMan *
13th December 2014 – 26th August 2019

Leave a Reply

Close Menu