About:


Index: 


Problems:


Misunderstandings:


Solutions:


Consider:

Glass See L40

  • Exclusion of UV light, use PVB Interlayers in laminated glass
  • Best U Values the project can afford, especially on the North face of the building
  • U Values of 1.0 W/m2.K and better are achievable
  • Use Double Glazed Sealed Units to EN1279-2 and BSI Kitemarked
  • Use Low E (Low Emissivity) glass generally
  • Use Argon, Pentane or CO2 in cavities

Framing:

  • Timber framed curtain walling
  • Timber: Hardwood, Heartwood of softwood, Slow grown timber, reclaimed timber
  • FSC approved timber sources and timber based materials See Z10
  • Recycled content aluminium: See Z11.2
  • Uncoated aluminium (but marginally reduces component life)
  • Recycling of coated aluminium: See Z3

Avoid:

Glass and Glazing

  • Single glazing in all cases
  • Double glazing if the project can afford triple glazing
  • Double Glazed Sealed Units only offering U Value 2.0 W/m2.K
  • Temperature on internal face of glass lower than 17 degrees C
  • Condensation on inner face of glass
  • Excessive glazing on north face (heat loss in winter)
  • Excessive glazing on south and south west face (heat gains in summer, unless it is managed and exploited)

Framing:

  • Powder coated and painted aluminium See Z31 and Z30
  • CCA (Copper Chrome Arsenic) Treated softwood, See Z12
  • PVC framing See Z50

Minimise:


Value Engineering:
(getting stuff into projects)


Substitute:


Health:


Wellbeing:


Safety:

  • _

Precautionary principle:

  •  _

Resource Efficiency:


Reduce:


Reclaim:


Reuse:


Recycle:


Recover:


Waste Issues:


Waste Catagory:


Hazardous waste:


Waste statistics:


End of Life options:


Appropriateness:


Competence:


Effectiveness:


Yardstick:


Maintenance issue:

  • _

Information sources:

  •  

© GBE NGS ASWS BrianMurphy aka BrianSpecMan
16th December 2012 – 6th November 2018

H11 Curtain Walling
Images: 


 


If you wish to reproduce images, feel free, but please acknowledge the source.


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
16th December 2012 – 6th November 2018

H11 Curtain Walling
See Also: 


NGS CHECKLIST

New Build

  • Trade/Work Section
  • Trade/Work section
Adaptation:
  • Trade work section:

NGS JARGON BUSTER

Theme

  • Term
  • Term
  • Term

NGS CPD

Seminar Topic Group

  • Seminar

NGS LINKS

  • Organisation/Website

NGS MANUFACTURERS


NGS PRODUCTS


NGS MATERIALS


NGS SYSTEMS


NGS ELEMENTAL ASSEMBLIES


NGS CALCULATOR

  • Product

NGS CAD

  • 2D and 3D SketchUp Product files
  • SketchUp files of Construction Sections

NGS GREEN BUILDING SPECIFICATION

NGS ROBUST SPECIFICATION

  • Robust Specification Clause
  • Robust Specification Work Section

NGS LIBRARY


NGS PROJECTS


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
16th December 2012 – 6th November 2018

Leave a Reply

Close Menu