GBE > Encyclopaedia > Code > Jargon Buster > G#700 N#722
Jargon Buster Index CAWS A
Jargon Buster Index CAWS A
Index:
- A10 PROJECT PARTICULARS
- A11 TENDER AND CONTRACT DOCUMENTS
- A12 THE SITE/EXISTING BUILDINGS
- A13 DESCRIPTION OF THE WORK
- A20 CONTRACT
- A30 TENDERING/SUB-LETTING/SUPPLY
- A31 PROVISION, CONTENT AND USE OF DOCUMENTS
- A32 MANAGEMENT OF THE WORKS
- A33 QUALITY STANDARDS/CONTROL
- A34 SECURITY/SAFETY/PROTECTION
- A35 SPECIFIC LIMITATIONS ON METHOD/SEQUENCE/TIMING
- A36 FACILITIES/TEMPORARY WORK/SERVICES
- A37 OPERATION/MAINTENANCE OF THE FINISHED BUILDING
- (CPIC CAWS)
- A38 CONSTRUCTION/DEMOLITION WASTE MANAGEMENT
- A39 PACKAGING WASTE MANAGEMENT
- (GreenSpec CAWS+)
- A40 CONTRACTOR’S GENERAL COST ITEMS: MANAGEMENT AND STAFF
- A41 CONTRACTOR’S GENERAL COST ITEMS: SITE ACCOMMODATION
- A42 CONTRACTOR’S GENERAL COST ITEMS: SERVICES AND FACILITIES
- A43 CONTRACTOR’S GENERAL COST ITEMS: MECHANICAL PLANT
- A44 CONTRACTOR’S GENERAL COST ITEMS: TEMPORARY WORKS
- A50 WORK/PRODUCTS BY/ON BEHALF OF THE EMPLOYER
- A51 NOMINATED SUBCONTRACTORS
- A52 NOMINATED SUPPLIERS
- A53 WORK BY STATUTORY AUTHORITIES
- A54 PROVISIONAL WORK
- A55 DAYWORKS
- (CPIC CAWS)
- A56 ADVANCED PROCUREMENT
- (GreenSpec ’12)
- A60 DEMOLITION CONTRACT PRELIMINARIES
- A61 GROUND INVESTIGATION CONTRACT PRELIMINARIES
- A62 PILING CONTRACT PRELIMINARIES
- A63 LANDSCAPE CONTRACT PRELIMINARIES
- A70 GENERAL SPECIFICATION FOR FABRIC WORK PACKAGES
- A71 GENERAL SPECIFICATION FOR BUILDING SERVICES WORK PACKAGES
- (CPIC CAWS)
- A90 PERFORMANCE SPECIFICATION
- A91 PRESCRIPTIVE SPECIFICATION
- A92 PACKAGE OUTLINE SPECIFICATION
- A93 PERFORMANCE TESTING OFF-SITE MOCK-UP TEST RIGS
- A94 AIRTIGHTNESS TESTING ON-SITE
- A95 INFRA-RED THERMOGRAPHIC SURVEYS
© GBE NGS ASWS BrianMurphy
aka BrianSpecMan
2nd February 2013 – 2nd January 2019
Jargon Buster Index CAWS A
Alphabetic:
- R11 Above ground foul drainage systems
- R10 Above ground Rainwater drainage systems
- R12 Above ground soil and waste drainage systems
- W40 Access control systems
- E42 Accessories cast into in situ concrete
- Y74 Accessories for electrical services
- F30 Accessories/Sundry Items For Brick/Block/Stone Walling
- W32 Active data distribution
- A56 Advanced Procurement
- W22 Advertising/information display
- U4 Air conditioning – air and water
- U3 Air conditioning – all air
- U30 Air conditioning systems
- U91 Air conditioning systems – domestic
- U70 Air curtains
- Y30 Air ductlines
- Y31 Air ductlines ancillaries
- U80 Air Ductwork and ancillaries
- U83 Air filtration
- Y42 Air filtration
- U81 Air handling units
- Y40 Air handling units
- U88 Air terminal devices
- U86 Air treatment
- Y44 Air treatment
- A94 Airtightness testing on-site
- C9 Alteration composite items
- C3 Alteration-Support
- C91 Alteration: Resource Recovery/Waste Minimisation
- C90 Alterations Spot Items
- T16 Alternative fuel boilers
- H72 Aluminium strip/sheet coverings/flashings
- U17 Anaesthetic gas extract
- Z38.1 Anodic Oxide Coating (Performance:Europe)
- Z38 Anodic Oxide Coatings
- Z33 Anodising
- J2 Asphalt coatings
- W52 Assistance call systems
- W53 Assistance Call systems
- W1 Audio
- W2 Audio-Visual
- X32 Automatic document filing and retrieval systems
- V51 Automatic light controls
- V36 Automatic Power Factor Correction Equipment
© GBE NGS ASWS BrianMurphy
aka BrianSpecMan
24th February 2013 – 2nd January 2019
Jargon Buster Index CAWS A
See Also:
© GBE NGS ASWS BrianMurphy
aka BrianSpecMan
24th February 2013 – 2nd January 2019