GBE Green Building Encyclopaedia, GBL Green Building Learning, CPD Continuing Professional Development, Waste-DesignToReduce A04 BRM BrianSpecMan 140326 S1 Cover Slide

Zero Waste Scotland Design to Reduce Waste Guide

GBE > Blog > News > Bids > G#12991

About:


Enquiry:

Brian Menzies of Enscape (formerly of EnviroCentre and author of the ICE Demolition Protocol and WRAP Aggregation Demolition Module) was looking for Design Know-how for a Zero Waste Scotland Project Regulated Open Tender:

Title:

  • Designing Out Construction Waste – Guidance and Pilot Support

Abstract:

  • ZWS wishes to appoint a contract for the development of a guidance document specifically aimed towards architects and designers, with the purpose of promoting and encourage the designing out of waste in new build and refurbishment projects.
  • Following launch of the guide, the contract will then require the provision of free advice and support to an architect or designer, to implement the recommendations in the guide in a live project and document all achievements.
  • There are three key elements to this contract:
    • 1) Preparing the guidance document
    • 2) Support to an architect and/or designer
    • 3) Promotion of the guide
  • ZWS proposes that the project begins with the Contract Initiation Meeting and concludes no later than 27 January 2017, although tenderers are encouraged to consider how the project can be fully delivered in advance of this date.

The second of many tenders for a large EU supported programme.

This requires development of a Design Guide to suit.

Brian Menzies approached Brian Murphy of GBE, having been a partner with BRE on a PII Parters In Innovation project in which CPD seminar material was first developed, then GBE are the ideal partner for this one.

The two Brians had previously worked together when Menzies developed ICE Demolition Protocol, Murphy developed the GBS Deconstruction and Alterations Specifications, their supporting appendix and on the WRAP Aggregation website Demolition Module (now gone)


Inputs:

DTI PII Waste and Recycling Project. Lead partner: BRE, Partners: ASWS and NGS
Brian Murphy wrote over 35 hours of Waste focussed CPD for construction, refurbishment, landscape, packaging, demolition/deconstruction, excavation.

  • Design to Reduce Waste: 381 slides, 1.5 to 2 hour workshops
  • GBE-CPD-Waste-DesignToReduce-A04BRM140326-S304.pdf (PDF In Dropbox to view)
  • A38 Construction Waste management/minimisation Preliminaries
  • C13 Building Fabric Surveys.
  • C20 Demolition/Deconstruction Resource Recovery/Waste Minimisation Specifications
  • C22 Demolition/Deconstruction Resource Recovery: Services
  • C91 Alteration – Resource Recovery/Waste Minimisation
  • D20 Excavation/Filling Resource Recovery/Waste minimisation
  • Q29 Landscape Resource Recovery/Waste minimisation.
  • Each has their own Green Building Specification

Submission:

Enscape will be lead Partner, Brian Menzies is preparing the proposals and each other party reviewed and contributed.

A proposal will be submitted.

Watch this space


We did not win the bid

The winner submitted extra proposals after the deadline on project administration.

The final document is word heavy and image light despite the fact that few Architects will read enough of it to be behaviour changing.

%%%


© GBE GBC GRC GIC GGC GBL NGS ASWS Brian Murphy aka BrianSpecMan ******
21st September 2016 – 3rd August 2026

Images:


euscotlandlogozerowastescotland

enscapelogo

Green Building Encyclopaedia GBE Hexagonal logo large

brm-reseff-cv

GBE Green Building Encyclopaedia, GBL Green Building Learning, CPD Continuing Professional Development, Waste-DesignToReduce A04 BRM BrianSpecMan 140326 S1 Cover Slide


© GBE GBC GRC GIC GGC GBL NGS ASWS Brian Murphy aka BrianSpecMan ******
21st September 2016 – 3rd August 2026

See Also:


GBE CPD

Topic: Waste

Seminar Title: Waste (Many)


GBE Jargon Buster

Theme: Waste


GBE Projects Information


GBE Checklist


GBS Green Building Specification

  • A38 Construction Waste Management
  • A39 Packaging Waste Management
  • C13 Building Fabric Surveys.
  • C20 Demolition/Deconstruction Resource Recovery/Waste Minimisation Specifications
  • C22 Demolition/Deconstruction Resource Recovery: Services
  • C91 Alteration – Resource Recovery/Waste Minimisation
  • D20 Excavation/Filling Resource Recovery/Waste minimisation
  • Q29 Landscape Resource Recovery/Waste minimisation.
  • Each with their own Guidance Notes and Advisory Organisations & Websites

Supporting Appendices:

GBE Appendix G#1066 N#1084

GBS A90 Performance Specification and Supporting Appendix G#1251

  • APP SWMP    Appendix: Site Waste Management Plan Checklist & Datasheets & Calculator
  • APP EWC        Appendix: European Waste Catalogue
  • APP MWE       Appendix: Material Waste Exchanges
  • APP TBS          Appendix: Take Back Schemes
  • APP SDOE       Appendix: Site & Design Office Expendables
  • APP FFEI         Appendix: Furniture, Fittings, Equipment & IT Salvage & Reuse
  • APP MRR        Appendix: Materials Recovery and Reuse
  • APP ROMP     Appendix: Recycling Operations: Materials & Packaging
  • APP PDA         Appendix: Pre-Demolition Audit
  • APP SPDQ      Appendix: Schedule of Pre-demolition Quantities
  • APP ASR         Appendix: Architectural Salvage Recovery
  • APP RCP         Appendix: Recycled Construction Products & Materials

© GBE GBC GRC GIC GGC GBL NGS ASWS Brian Murphy aka BrianSpecMan ******
21st September 2016 – 3rd August 2026

Leave a Reply

Share