About:


Enquiry:

Brian Menzies of Enscape (formerly of EnviroCentre and author of the ICE Demolition Protocol and WRAP Aggregain Demolition Module) was looking for specification writing skills for a Zero Waste Scotland Project Regulated Open Tender:

4CN001-001 Model Clauses for Construction Waste Reduction through Procurement

The first of many tenders for a large EU supported programme.

This requires interrogation of current and existing Scottish legislation and authoritative guidance:

  • Waste Aware Scotland (WAS),
  • Zero Waste Scotland (ZWS)
  • Waste Resource Action Programme (WRAP)
  • CRWP publications

And development of specification clauses to suit.

Brian Menzies approached Brian Murphy of GBE, having been a partner with BRE on a PII Parters In Innovation project to write waste specification clauses, then GBE were the ideal partner for this one.

The two Brians had previously worked together when Menzies developed ICE Demolition Protocol, Murphy developed the GBS Deconstruction and Alterations Specifications, their supporting appendix and on the WRAP Aggregation website Demolition Module (now gone)

We also needed Legal, Contractural, Cost guidance and WLC and LCA contributions.

Andrew Norton LCA specialist of Renuables and member of the CAPEM project team with Brian Murphy as UK Partner was invited to participate.

Inputs:

DTI PII Waste and Recycling Project. Lead partner: BRE, Partners: ASWS and NGS
Brian Murphy wrote specifications for construction refurbishment, landscape, packaging, demolition/deconstruction, excavation and many supporting appendix on waste management:

  • A38 Construction Waste management/minimisation Preliminaries
  • C13 Building Fabric Surveys.
  • C20 Demolition/Deconstruction Resource Recovery/Waste Minimisation Specifications
  • C22 Demolition/Deconstruction Resource Recovery: Services
  • C91 Alteration – Resource Recovery/Waste Minimisation
  • D20 Excavation/Filling Resource Recovery/Waste minimisation
  • Q29 Landscape Resource Recovery/Waste minimisation.
  • Each with their own Guidance Notes and Advisory Organisations & Websites

12 supporting Appendices:

  • APP SWMP    Appendix: Site Waste Management Plan Checklist & Datasheets & Calculator
  • APP EWC        Appendix: European Waste Catalogue
  • APP MWE       Appendix: Material Waste Exchanges
  • APP TBS          Appendix: Take Back Schemes
  • APP SDOE       Appendix: Site & Design Office Expendables
  • APP FFEI         Appendix: Furniture, Fittings, Equipment & IT Salvage & Reuse
  • APP MRR        Appendix: Materials Recovery and Reuse
  • APP ROMP     Appendix: Recycling Operations: Materials & Packaging
  • APP PDA         Appendix: Pre-Demolition Audit
  • APP SPDQ      Appendix: Schedule of Pre-demolition Quantities
  • APP ASR         Appendix: Architectural Salvage Recovery
  • APP RCP         Appendix: Recycled Construction Products & Materials

Submission:

Enscape will be lead Partner, Brian Menzies prepared the proposals and each other party reviewed and contributed.

A proposal was submitted, we were unsuccessful.


Winning Team’s Document

%%%


© GBE GBC GRC GIC GGC GBL NGS ASWS Brian Murphy aka BrianSpecMan ******
20th September 2016 – 13th August 2026

Images:


euscotlandlogozerowastescotlandzwswasteredclausescover

enscapelogo

Green Building Encyclopaedia GBE Hexagonal logo largerenuables-large

brm-reseff-cv


© GBE GBC GRC GIC GGC GBL NGS ASWS Brian Murphy aka BrianSpecMan ******
20th September 2016 – 13th August 2026

See Also:


GBE Jargon Buster


GBE Projects Information

GBE Project Documents


GBE Checklist


GBS Green Building Specification

  • A38
  • C13 Building Fabric Surveys.
  • C20 Demolition/Deconstruction Resource Recovery/Waste Minimisation Specifications
  • C22 Demolition/Deconstruction Resource Recovery: Services
  • C91 Alteration – Resource Recovery/Waste Minimisation
  • D20 Excavation/Filling Resource Recovery/Waste minimisation
  • Q29 Landscape Resource Recovery/Waste minimisation.
  • Each with their own Guidance Notes and Advisory Organisations & Websites

12 supporting Appendices:

  • APP SWMP    Appendix: Site Waste Management Plan Checklist & Datasheets & Calculator
  • APP EWC        Appendix: European Waste Catalogue
  • APP MWE       Appendix: Material Waste Exchanges
  • APP TBS          Appendix: Take Back Schemes
  • APP SDOE       Appendix: Site & Design Office Expendables
  • APP FFEI         Appendix: Furniture, Fittings, Equipment & IT Salvage & Reuse
  • APP MRR        Appendix: Materials Recovery and Reuse
  • APP ROMP     Appendix: Recycling Operations: Materials & Packaging
  • APP PDA         Appendix: Pre-Demolition Audit
  • APP SPDQ      Appendix: Schedule of Pre-demolition Quantities
  • APP ASR         Appendix: Architectural Salvage Recovery
  • APP RCP         Appendix: Recycled Construction Products & Materials

By Others:


© GBE GBC GRC GIC GGC GBL NGS ASWS Brian Murphy aka BrianSpecMan ******
20th September 2016 – 26th August 2026

Zero Waste Scotland Waste Reduction Model Clauses G#12969 End.

Leave a Reply

Share