Checklist: 


Problems:

  • Avoid putting main and sub-contractors under time pressure which may lead to reduction in drying, curing, setting and strengthening times
  • Do not accept a revised programme to make up lost time if it fails to engage with correct drying, curing, setting and strengthening times
  • Do stick to the correct sequence of trades; do not stick to the programme if it means getting the sequence wrong

Misunderstandings:

  • Lean thinking (eliminating waste in process, time and management activity) applied incorrectly can lead to more wasted materials.
  • Efficient labour at the expense of efficiency in materials should be avoided

Solutions:


Value Engineering:
(stuff into projects, not out of them)


Consider:

  • Lean thinking to get sites working efficiently

Avoid:

  • Fast tack projects which are poorly managed which will generate more waste.

Minimise:


Substitute:


Resource Efficiency:


Reduce:


Reclaim:


Reuse:


Recycling:


Recover:


Waste Issues:


Waste Category:


Hazardous waste:


Waste Statistics:

  • 2.9 m tonnes (3.2% of 90 m. tonnes/year) of waste is through damage due to methods of work
  • 0.9 m tonnes (1% of 90 m. tonnes/year) of waste is generated by poor storage
  • 9.4 m tonnes (10.2% of 90 m. tonnes/year) of waste is Temporary works, Site hoardings and Formwork

End of life options:


Health and Safety Issues:


Wellbeing:


Maintenance issue:


Precautionary principle:


Biodiversity:


Information sources:


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
6th December 2014 – 14th November 2018

A35 Specific Limitations on Method/ Sequence/ Timing/Use of site
Images:


 


If you wish to reproduce images, feel free, but please acknowledge the source.


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
6th December 2014 – 14th November 2018

A35 Specific Limitations on Method/ Sequence/ Timing/Use of site
See Also:


NGS CPD


NGS JARGON BUSTER

Initials, Abbreviations, Acronyms
Names and phrases

NGS PROJECTS


NGS SPECIFICATIONS


NGS ROBUST SPECIFICATION


GreenBuildingSpecification


NGS PRODUCTS


NGS LIBRARY


NGS LINKS


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
6th December 2014 – 14th November 2018

Leave a Reply

Close Menu