 A37 Operation/Maintenance of the Finished Building

A37 Operation/ Maintenance of the Finished Building
Checklist: 


Problems:


Misunderstandings:


Solutions:


Value Engineering: (stuff into projects not out of them)


Consider:

  • Electricity Supply: ensure all sites are required to use a Green Tariff electricity supply throughout the works, commissioning and testing period and hand over the building to the Employer (Client) with the same Green Tariff electricity supply
  • Faber Maunsell (as was) researched and created the Management and Operation of Buildings Sustainable (MOBS)

Avoid:


Minimise:


Substitute:


Resource Efficiency:


Reduce:


Reclaim:


Reuse:

  • Store materials to prevent deterioration
  • Permit the use of opened and resealed and unopened tins of paint from the contract to be stored on site for use in snagging
  • Permit the use of unopened tins from the contract to be stored on site for use in 6 month defect repairs
  • Permit the use of unopened tins from the contract to be stored on site for use by the FM in maintenance of the building in use

Recycling:

  • Collect, segregate, reuse or recycle all redundant material.

Recover:


Waste Issues:


Waste Category:


Hazardous waste:


Waste statistics:


End of life options:


Health and Safety Issues:


Wellbeing:


Maintenance issue:


Precautionary principle:


Biodiversity:


Information sources:


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
6th December 2014 – 14th November 2018

A37 Operation/ Maintenance of the Finished Building
Images:


 


If you wish to reproduce images, feel free, but please acknowledge the source.


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
6th December 2014 – 14th November 2018

A37 Operation/ Maintenance of the Finished Building
See Also:


NGS CPD


NGS JARGON BUSTER

Initials, Abbreviations, Acronyms
  • MOBS
  • VE
Names and phrases
  • Green Tariff
  • Management and Operation of Buildings Sustainable (MOBS)
  • Value Engineering (VE)

NGS PROJECTS


NGS SPECIFICATIONS


NGS ROBUST SPECIFICATION


GreenBuildingSpecification


NGS PRODUCTS


Recycled:

Temporary floor protection:

  • Secondary cellulose fibre, recyclable or compostable after use
  • Manufacturer: Florprotec Ltd
  • Product Reference: Floortech

Temporary weatherproof sheeting:

  • 90% recycled LDPE (post consumer (water drainage pipes, milk bottles, drums, fertilisers bags)
  • Manufacturer: Extrusion and Moulding Compounds
  • Product name: Temporary sheeting

NGS LIBRARY


NGS LINKS


© GBE NGS ASWS BrianMurphy aka BrianSpecMan
6th December 2014 – 14th November 2018

Leave a Reply