SWMP Site Waste Management Plan workshops G#551 N#571

GBE > Projects > Information > G#551 N#571

SWMP Site Waste Management Plan workshops

SWMP Site Waste Management Plan workshops
About: 


SWMP Scope:


SWMP Development:

 


Past Recipients:

BrianSpecMan has developed and delivered Site Waste Management Plan workshops and seminars with and for:

  • UKCEED, CE, EA, Envirowise, BRE, WRAP, Kier, Simons,
  • Membership Groups: SECBE, EMCBE;
  • Consultants: Responsible Solutions (to 5 main contractors and their supply chain partners)
  • Local Authority: Brighton&Hove CC, Gateshead CC; DWF DirectWorkForce,
  • Contractors: Lovells, Wates;
  • Practice CPD: PDP,
  • Project teams: BDP, Manchester City Centre, St Davids Visitors Centre

Satisfied Customer’s Feedback:

  • Kier

NEWS 13/12/2013

Site Waste Management Plans: A Necessary Burden

Following a comprehensive government review of 21,000 regulations on different themes, DEFRA have indicated that Site Waste Management Plan (SWMP) will no longer be compulsory for construction projects in England. The deregulation is currently expected by October 2013.

In the Red Tape Challenge – Environment Theme Proposals issued in March 2012, DEFRA state “You told us to remove Site Waste Management Plans Regulations because they force companies to spend time and money estimating their waste production when they could be reducing waste through more effective activities, such as training employees”

It is unclear how a client or contractor can actually provide useful training to their employees or implement “more effective activities” without having first understood their waste streams type, quantities, and sources.

…read more

KLH Systainability
13th June 2013


© BrianSpecMan aka Brian Murphy
20th December 2012 – 22nd July 2013

SWMP Site Waste Management Plan workshops
Images: 


TGRDesignToReduceWaste.png

Fig. 1 Design to Reduce Waste (TGR SBS Workshop)


WasteRefurbHierarchy.png

Fig. 2 Waste Hierarchy: In Refurbishment


WasteSegRefurb.png

Fig. 3 Waste Segregation in Refurbishment


WasteImagesSkips.png

Fig. 4 Waste Skip Images


WasteDistributionCentre.png

Fig. 5 Waste & Consolidation Centres


WasteCostReduction.png

Fig. 6 Waste Cost Diagrams: Kier Event


WasteContainers.png

Fig. 7 Waste Containers & Collection


WasteColourCode.png

Fig. 8 Waste Colour Code & Labels


WasteDesignToReduceDiagrams.png

Fig. 9 Design to Reduce waste


© NGS BrianSpecMan aka Brian Murphy
2012 – 17th November 2013

SWMP Site Waste Management Plan workshops
See Also:


GBE Jargon Buster

Theme:

  • ASWS
  • BRE
  • BREMAP
  • NGS
  • SWMP
  • Architectual Specification Writing Services (ASWS)
  • Building Research Establisgment (BRE)
  • National Green Specification (NGS)
  • Site Waste Management Plan (SWMP)
  • Waste Types

GBE Information

  • DTI SWMP VCoP 2004
  • ENVIROWISE Publications:

GBE Checklist


GBE CPD

Collections:

  • Waste
  • Resource Efficiency

Files:

Seminars

  • Material Exchange 4 Specification
  • Waste Colour Code (P)
  • Waste Containers (P)
  • Waste Cost Reduction (P)
  • Waste Distribution Centre (P)
  • Waste Design to Reduce Diagrams (P)
  • Waste Hierarchy (P)
  • Waste Hierarchy 2012 (P)
  • Waste Images Skips (P)
  • Waste Refurb Hierarchy (P)

GBE Projects

Spin Off or related Projects:


GBE Robust Specification

GreenBuildingSpecification

  • A38 Waste Management Minimisation
  • A39 Packaging Waste Management Minimisation
  • C13 Building fabric Survey/Pre-demolition/Pre-Alteration Audit
  • C20 Demolishing Structures/Deconstruction Resource Recovery
  • C90 Alteration Spot Items
  • C91 Alteration Resource Recovery/Waste Minimisation
  • D20 Excavation Waste Management Minimisation
  • Q29 Landscape Waste Management
  • WEEE Waste Management

Appendix:

  • APP AREWM Appendix: Approaches to Resource Efficiency & Waste Minimisation
  • APP ASR Appendix: Architectural Salvage Recovery
  • APP EWC Appendix: European Waste Catalogue
  • APP FFEI Appendix: Furniture, Fittings, Equipment
  • APP WEEE Appendix: IT Salvage & Reuse
  • APP LDN Appendix: Logistics Distribution Network
  • APP MEW Appendix: Material Exchange Websites
  • APP MRR Appendix: Materials for Recovery and Reuse
  • APP PDA Appendix: Pre-demolition/Alteration Audit
  • APP PPR Appendix: Packaging Producer Responsibility
  • APP ROMP Appendix: Recycling Operations: Materials & Packaging
  • APP SDOE Appendix: Site & Design Office Expendables
  • APP SPDQ Appendix: Schedule of Pre-demolition/Alteration Quantities
  • APP SWMP Appendix: Site Waste Management Plan Checklist & Datasheets
  • APP TBS Appendix: Take Back Schemes

GBE LINKS

  • WRAP
  • AGGREGAIN (No longer)
  • BRE
  • BREMAP
  • CIRIA
  • MATERIAL EXCHANGE
  • SALVO MIE
  • SALVO
  • UKCEED (no longer)

© GBE NGS ASWS BrianSpecMan aka Brian Murphy
20th December 2012 – 1st September 2016

Leave a Reply