GBE Jargon Buster CAWS P Alphabetic
GBE > Encyclopaedia > Code > Jargon Buster > CAWS > P > G#835 N#857
Index:
- P Building fabric sundries
- P1 Sundry proofing/insulation
- P10 Sundry insulation/proofing work/fire stops (CPD) (Checklist) (Shop) (Specification)
- P11 Foamed/Fibre/Bead cavity wall insulation (Checklist)
- P12 Fire stopping systems
- P13 Hemp-lime sprayed insulation
- P14 Air/Wind tightness systems (Checklist) (Shop) (Specification)
- P2 Sundry finishes/fittings
- P20 Unframed isolated trims/skirtings/sundry items
- P21 Ironmongery
- P22 Sealant joints
- P23 Movement joints
- P3 Sundry work in connection with engineering services
- P30 Trenches/Pipeways/Pits for buried engineering services
- P31 Holes/Chases/Covers/Supports for services
- P32 Services painting systems
- P33 Plinths and Bund systems
- P39 Cable Pass Throughs
© CCPI 1987 & 1998
© GBE NGS ASWS 1987-2016
© GBE GBC GBL NGS ASWS Brian Murphy aka BrianSpecMan **
10th January 2013 – 15th February 2023
GBE Jargon Buster CAWS P Alphabetic
- A92 Package Outline
- T13 Packaged steam generators
- A39 Packaging Waste Management (Checklist)
- M60.1 Paint on timber
- M6 Painting
- M60 Painting/Clear finishing (Checklist)
- M60.8 Painting/Clear Finishing:
- M60.3 Painting/Clear finishing: Ferrous Metalwork
- M60.7 Painting/Clear finishing: Furniture finishes
- M60.0 Painting/Clear Finishing: Generally
- M60.4 Painting/Clear Finishing: non-ferrous Metalwork
- M60.5 Painting/Clear Finishing: Porous materials
- M60.9 Painting/Clear Finishing: Refurbishment/Repainting
- M60.6 Painting/Clear finishing: Special purpose paints
- H4 Panel cladding
- K30 Panel partitions
- B14 Panelled constructions
- F19 Papercrete block walling
- H10 Patent glazing
- Q Paving/Planting/Fencing/Site furniture
- Q2 Pavings
- A90 Performance Specification (CPD Show Handout) (Checklist) (Specification) (Guidance) (DofC) (SoMR)
- A93 Performance Testing Off-site Mock-up Test rigs
- E66 Permanent formwork beam and topping
- N25 Permanent safety equipment
- N25.2 Permanent safety equipment: Access cradles
- N25.1 Permanent safety equipment: Safe Access lines
- W70 Personnel counting systems
- X1 Personnel transport
- S40 Petrol and diesel supply systems
- V14 Photovoltaic systems
- D3 Piling
- D30 Piling
- A62 Piling contract preliminaries
- S Piped supply systems
- Y11 Pipeline ancillaries
- Y2 Pipeline equipment
- Y10 Pipelines
- Y1 Pipelines and ancillaries
- H60 Plain roof tiling
- E64 Plank floor/roof
- N14 Plant containers
- Q3 Planting
- Q32 Planting in special environments
- K10 Plasterboard dry lining/partitions/ceilings
- K31 Plasterboard fixed partitions/inner walls/linings
- M2 Plastered coatings
- M20 Plastered/Rendered/Roughcast coatings
- H22 Plastic weatherboarding
- L12 Plastic windows rooflights screens louvres
- Z50 Plastics
- H12 Plastics glazed vaulting walling
- H32 Plastics profiled sheet cladding/covering
- L22 Plastics rubber doors shutters hatches
- Q51 Play/Sports Equipment
- P33 Plinths and Bund systems
- X31 Pneumatic document conveying systems
- Z31.1 Polyester Powder Coating (Performance European)
- J45 Polyethylene roof coverings
- Z35.1 Polyvinylidene Di-fluoride Coating (PVF2)
- Z35 Polyvinylidene Fluoride Coating (PVDF)
- N17 Portable Fire fighting systems
- G23 Post and Beam frame
- E31 Post tensioned reinforcement for in situ concrete
- Z31 Powder Coating
- V4 Power
- E50 Precast concrete frame structures
- H42 Precast concrete panel cladding/features
- F31 Precast concrete sills/lintels/copings/features
- H50 Precast concrete slab cladding features
- L32 Precast concrete stairs/balustrades
- E60 Precast/Composite concrete decking
- E62 Precast/Composite concrete decking (clay pot/beam)
- E63 Precast/composite concrete walling panels
- B11 Prefabricated building units
- B1 Prefabricated buildings/structures/units
- G31 Prefabricated timber unit decking
- D31 Preformed concrete piling
- H16 PREFORMED STRUCTURAL GLASS PLANK CLADDING
- A6 Preliminaries for specialist contracts
- A Preliminaries/General conditions
- A91 Prescriptive Specification
- W25 Presentation and conferencing systems
- Z12 Preservative/Fire retardant treatments for timber
- S11 Pressurised water supply systems
- S13 Pressurised water supply systems
- T20 Primary heat distribution
- T61 Primary secondary cooling distribution
- H3 Profiled/flat sheet cladding/covering
- A10 Project particulars
- W21 Projection (CPD Show Handout) (Checklist) Shop: (Specification) (Guidance) (Reference) (Manufacturers/Suppliers) (Applicators)
- B10 Proprietary buildings/structures (Checklist)
- J22 Proprietary roof decking with asphalt finish
- J43 Proprietary roof decking with felt finish
- W6 Protection
- Q56 Provision for Nature
- A31 Provision, content and use of documents
- A54 Provisional work
- W11 Public address system
- F16 Pumice lime block walling
- R18 Pumping stations and pressure pipelines
- Y20 Pumps
- Z10 Purpose made joinery (Checklist)
- Z11 Purpose made metalwork (Checklist)
- Z11.2 Purpose made metalwork: Aluminium (Checklist)
- Z11.3 Purpose made metalwork: Austenitic Stainless Steel (Checklist)
- Z11.4 Purpose made metalwork: Copper & Copper Alloy (Checklist)
- Z11.0 Purpose made metalwork: Generally (Checklist)
- Z11.1 Purpose made metalwork: Mild Steel (Checklist)
© GBE GBC GBL NGS ASWS Brian Murphy aka BrianSpecMan **
24th February 2013 – 15th February 2023