Skip to main content
search

Thermo-Pro® G#9075

By 9 January 2016February 13th, 2016Systems

GBE > Encyclopaedia > Product > System > G#9075

Thermo-Pro®

Thermal Breaks Insulated Profiles To EWI External Wall Insulation


GBE Blog > News

  • Click on scrolling images to get static, larger, crisper, whole images
  • Click on Tab 6 Manufacturer’s Downloads to open documents

Thermo-Pro®

Thermal Breaks Insulated Profiles To EWI External Wall Insulation

Tabs with added * indicates it contains Accessory specific information


    Thermo-Pro®

     


    • Literature
    • Application
    • Accessory
    • Installation
    • Complete

    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    9th January 2016

    Thermo-Pro®


    Draft Information

    INTRODUCTION

    Cold Thermal Bridging in External Wall Insulation (EWI)

    Enviroform Solutions Ltd. have developed a number of unique products using Aerogel thermal conductivity insulation combined with various materials, to tackle the issue of cold thermal bridging and weathering at key junctions when installing External Wall Insulation.

    The Key Junctions in question addressed are:

    • 1 Windows & Door: Reveals & Sills
    • 2 Soil Pipes & Gate Posts / Fences
    • 3 Eaves & Gutter: where little or no overhanging soffit exists
    • 4 Lead Flashing Details: Bay windows to walls – Single storey beside two storey; EWI above pitched roof
    • 5 Below DPMC Level: above ground level

    Failure to identify and adequately deal with these cold thermal bridging elements can lead to

    • A Increased heat loss from a dwelling compared with what was assumed determined during energy modelling.
    • The Risk of surface condensation or mould from lowered internal Surface temperature at or near the Thermal Bridge Junction.
    • C Risk of mould growth from spores in surface condensation at or near the Thermal Bridge Junction.

    By introducing the Thermo-Pro® Soil Pipe insulated profile the linear thermal transmittance is reduced by over 70% and the internal surface temperature is increased by 2.2oC significantly reducing the risk of surface condensation reducing the risk of mould and creating an unhealthy indoor environment.


    GBE Features & Benefits Schedule

    Thermo-Pro Features: Thermo-Pro Benefits:
    Purpose made solutions Made for retrofit EWI (not designed for new build EWI)
    Solves the problem of existing external attachments No need to ignore them or stop insulation short any more
    Comprehensive set of solutions Enables a complete competent EWIS
    Readymade set of complimentary parts Faster, simpler installations
    Thermo-Pro Profiles can be fitted by details specialist ahead of the EWI main insulation works Simplifies and speeds up the job of the primary EWIS specialist sub-contractor.
    Readymade parts fit and accommodate EWI Compatible with BBA Certified EWI Systems on market
    Lightweight and simple installation Thermo-Pro Profiles can be fitted without scaffolding.
    ??? Reduced disruption to access. What does that mean?
    Robust profiles Reduce risk of damage to EWI insulation.
    Superior Weatherproofed solution Superior and simple compared to made-up on site solutions
    Pre-finished solution Painting not dictated by weather conditions on site
    Lead, plastic or powder coated aluminium Long life durable materials and finishes
    Profiles have built-in thermal break insulation No thermal breaks bridges in EWI.
    Increased Internal Surface Temperature Reduces risk of internal surface condensation
    Warm and dry internal surfaces Avoids risk of damp activating spores generating mould
    Mould-free surfaces Avoids risk of asthma and other respiratory illnesses
    Mould-free surfaces Keeps accommodation fit for purpose and occupied


    GBE Accessories

    • Thermo-Pro Thermally insulated profiles for EWI (External wall insulation)
      • 1 Thermo-Bead G#8714
        • (Window/Door Reveal Lining for EWI)
      • 6 Thermo-Trac Dynamic
      • 7 Thermo-Pro Column Cladding Insulation
      • 8 Thermo-Pro Finlock
        • (Precast concrete gutter Fascia
      • 9 Thermo-Pro Eaves/Gutter
        • (abutments for EWI)
      • 10 Thermo-Flash (Gutter Fascia)

    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 13th February 2016

    Thermo-Pro®


    GBE Incubator

    Draft Statement

    INTRODUCTION

    Cold Thermal Bridging in External Wall Insulation (EWI)

    Enviroform Solutions Ltd. have developed a number of unique products using Aerogel thermal conductivity insulation combined with various materials, to tackle the issue of cold thermal bridging and weathering at key junctions when installing External Wall Insulation.

    The Key Junctions in question addressed are:

    • 1 Windows & Door: Reveals & Sills
    • 2 Soil Pipes & Gate Posts / Fences
    • 3 Eaves & Gutter: where little or no overhanging soffit exists
    • 4 Lead Flashing Details: Bay windows to walls – Single storey beside two storey; EWI above pitched roof
    • 5 Below DPMC Level: above ground level

    Failure to identify and adequately deal with these cold thermal bridging elements can lead to

    • A Increased heat loss from a dwelling compared with what was assumed determined during energy modelling.
    • The Risk of surface condensation or mould from lowered internal Surface temperature at or near the Thermal Bridge Junction.
    • C Risk of mould growth from spores in surface condensation at or near the Thermal Bridge Junction.

    By introducing the Thermo-Pro® Soil Pipe insulated profile the linear thermal transmittance is reduced by over 70% and the internal surface temperature is increased by 2.2oC significantly reducing the risk of surface condensation reducing the risk of mould and creating an unhealthy indoor environment.


    GBE Features & Benefits Schedule

    Thermo-Pro Features: Thermo-Pro Benefits:
    Purpose made solutions Made for retrofit EWI (not designed for new build EWI)
    Solves the problem of existing external attachments No need to ignore them or stop insulation short any more
    Comprehensive set of solutions Enables a complete competent EWIS
    Readymade set of complimentary parts Faster, simpler installations
    Thermo-Pro Profiles can be fitted by details specialist ahead of the EWI main insulation works Simplifies and speeds up the job of the primary EWIS specialist sub-contractor.
    Readymade parts fit and accommodate EWI Compatible with BBA Certified EWI Systems on market
    Lightweight and simple installation Thermo-Pro Profiles can be fitted without scaffolding.
    ??? Reduced disruption to access. What does that mean?
    Robust profiles Reduce risk of damage to EWI insulation.
    Superior Weatherproofed solution Superior and simple compared to made-up on site solutions
    Pre-finished solution Painting not dictated by weather conditions on site
    Lead, plastic or powder coated aluminium Long life durable materials and finishes
    Profiles have built-in thermal break insulation No thermal breaks bridges in EWI.
    Increased Internal Surface Temperature Reduces risk of internal surface condensation
    Warm and dry internal surfaces Avoids risk of damp activating spores generating mould
    Mould-free surfaces Avoids risk of asthma and other respiratory illnesses
    Mould-free surfaces Keeps accommodation fit for purpose and occupied

    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®


    • PASS Schedule
    • Product
    • Accessory
    • System
    • Screening

    GBE Collaborate Services

    • G#515 N#533 GBE PASS
    • G#747 N#769 GBE PASS Navigation

    GBE Jargon Buster


    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    GBE HERACEY

    • Healthy
    • Environmental
    • Resourceful
    • Appropriate
    • Competent
    • Effective
    • Yardstick

    GBE Collaborate Services

    GBE Jargon Buster


    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®


    GBE Library

    Enviroform Solutions Ltd.

    External Wall Insulation (EWI) Accessories


    Thermo-Pro Brochure
    EnviroformThermoProGuide


     


    CDL Bead Soofit & Trac

    ConstructiveDetails8Enviroform

    GBE LCA & EPD

    Sub-system Component

    Spaceloft EPD

     

    SpaceLoftAerogelEPD


    • Brochure (See Manufacturer page)
    • Promotional Literature
    • Technical Literature
    • Specification
    • Method Statement
    • Schedule
    • Colour Swatch
    • CPD Seminar
    • CAD Files
    • BBA Certificate
    • ETA Certificate
    • CE Mark Certificate
    • Green Label
    • Health Label

    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro® Thermo-Bead


    GBE System Product Data Sheet

    Pending


    GBE Collaborate Services


    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    BIM CAD Model



    GBE Collaborate Services

    • G#452 N#458 GBE BIM

    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    BIM Product Data Sheet


    Selected from CIBSE BIM Product Data Sheets or developed to suit

    PDT CableLadderSystem


    GBE Collaborate Services

    • GBE BIM Accessory Data Sheet

    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    5th December 2015 – 9th January 2016

    Thermo-Pro® 

    COBie Spreadsheet

    • COBie Excel Spreadsheet
    • GBE Excel Short Spreadsheet

    CobieTable

    • Short code URL
    • GBE Repository for LCA data for Environmental Cell
    • GBE 301 Redirect file to maintain links

    GBE Collaborate Services

    • GBE BIM COBie Data Sheet

    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®


    Draft Specification Clause: Accessory

    M21     INSULATION WITH RENDERED FINISH (EXTERNAL WALL INSULATION EWI)
    To be read with the Preliminaries/General conditions[ A10-A55 and A90]

     

    260E    THERMAL BREAK TO WINDOW/DOOR OPENING JAMBS WITHIN EWI

    • Drawing Reference(s): [________]
    • Constructive Details Ltd.:
    • CD0107 Thermo-Bead
    • Reference Documents:
    • Constructive Details Ltd.:
    • A handbook of thermal bridging details incorporating Instaclad insulated themal profile solutions
    • Book 8 — Cold bridging solutions for insulating on retrofit External Wall Insulation
    • Substrate: Existing 1 Brick thick solid brick/masonry wall; fair faced externally; plastered internally.
    • Existing window or door in position against masonry opening jamb.
    • Opening Jamb Insulation Bead: Thermal conductivity insulation to jamb, from outer face of window/door to outer face of masonry.
    • Thermal Conductivity Insulation:
    • Insulation Material: Aerogel
    • Product Reference: Spaceloft Aerogel
    • Manufacturer: Aspen Aerogels Inc. USA
    • Thickness: [5/10] mm
    • Protection: Vapour Control Layer: Foil wrapped Insulation
    • Product Reference: Thermo-Pro Thermo-Bead
    • Model Reference & Size: [
    • TB5/1: 5 x 50 x (cut from) 2500 mm.
    • TB5/2: 5 x 75 x (cut from) 2500 mm.
    • TB5/3: 5 x 100 x (cut from) 2500 mm.
    • TB5/4: 5 x 125 x (cut from) 2500 mm.
    • TB5/5: 5 x 150 x (cut from) 2500 mm.
    • TB10/7: 10 x 50 x (cut from) 2500 mm.
    • TB10/8: 10 x 75 x (cut from) 2500 mm.
    • TB10/9: 10 x 100 x (cut from) 2500 mm.
    • TB10/10: 10 x 125 x (cut from) 2500 mm.
    • TB10/11: 10 x 150 x (cut from) 2500 mm.]
    • Profile: pressed/extruded angle
    • Metal: Aluminium
    • Finish: Powder coated to work section Z31
    • Colour: not exposed, no colour requrements,
    • Colour: [______], RAL/BS 4800: [________].
    • Gloss level: [________] %
    • Installation: See M21/390E
    • Fasteners: assuming brickwork and lime mortar
    • Material: [________]
    • Type: [________]
    • Size: [________]
    • Spacing: [________]
    • Apply insulation across opening jamb, against both masonry and fixed window/door frame, with angle bead outwards from opening jamb in contact with outer-face of fixed frame of window/door, to receive render system.

    • © GBE NGS ASWS BrianSpecMan aka Brian Murphy
      18th December 2015 – 5th January 2016

    Thermo-Pro®

    System Application Data Sheet


    GBE Collaborate Services

    • GBE System Application Data Sheet
    • (Based on CAPEM Product Data Collection Sheet)

    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    GBE Products


    See Tab 2 About System & 14 Accessories


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    GBE Accessories


    • IWI internal wall insulation by others
      • Thermo-Soc Accessory by Enviroform Solutions Ltd.
    • IWI internal wall insulation by Enviroform Solutions Ltd.
      • E-line Superslim
      • E-Line Slim
      • E-line Natural
      • E-Line Natural-Hybrid
    • EWI External Wall Insulation System by others
      • Accessories by Enviroform Solutions Ltd. 
    • EWI External Wall Insulation System by Enviroform Solutions Ltd.
      • External Wall & Walkway/Balcony/Roof Parapet Sides:
        • Renderline Superslim
    • Square hollow steel columns by others
      • Insulating cladding by Enviroform Solutions Ltd.
    • Ultratherm Aerogel Flooring for retrofit
      • E-Therm Slim Floor
        • (Insulated Dry Floor System)
    • External Floor/Walkway and roof terrace/balcony insulation systems
      • Topside:
        • Instaline Superslim Balcony Insulation Solution
        • CTF (Cut to Fall) Superslim Balcony/Terrace Insulation Solution
        • Cut to fall Balcony Insulation
      • Parapet Side:
        • Renderline Superslim
      • Underside:
        • E-Line (all 4 systems?)
      • Underside Accessories:
        • Floor Soffit Cable/Pipe tray Insulation
    • Pitched Roof Insulation
      • Within Batten Zone

    • Products
    • Accessories
    • Elemental Assemblies
    • CAWS/NBS Building Work section: [____]
    • NBS/NGS clause number:  [____]
    • Uniclass/NBS Create Work section: [________]
    • NBS Create/NGS clause number: [________]
    • SYSTEM SPECIFICATION CLAUSE TITLE
    • Reference Drawing(s): [_______] (left blank for project editor)
    • Location: [_______] (left blank for project editor)
    • System Assembly:
    • Product(s): to [____/____]
    • Accessories: to [____/____]
    • Elemental Assembly: [________]
    • Legend Reference Number: [________]
    • Substrate: [_______] (left blank for project editor)
    • Preparation: [_______] (left blank for project editor)
    • Application: [________]
    • Specification
    • Schedule
    • Method Statement:

    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    Elemental Assemblies


     

    • CAWS/NBS Building Work section: [____]
    • NBS/NGS clause number:  [____]
    • Uniclass/NBS Create Work section: [________]
    • NBS Create/NGS clause number: [________]
    • ELEMENTAL ASSEMBLY CLAUSE TITLE:
    • Legend Element Reference: [________]
    • GBE BEACON: [________]
    • Reference Drawing(s): [_______] (left blank for project editor)
    • Location: [_______] (left blank for project editor)
    • Schedules: [________]
    • Elemental Performances: to [________]
    • Prior Element: [_______] (left blank for project editor)
    • Prior trade sign off: [________]
    • Substrate: [_______] (left blank for project editor)
    • Preparation: [_______] (left blank for project editor)
    • Components: (bottom to top; outer, core to inner)
    • Sub Assembly System: Below: [________] to [____/____]
    • Core Assembly System: Horizontal: [________] to [____/____]
    • Sub Assembly System: Above: [________] to [____/____]
    • Sub Assembly: Outer: [________] to [____/____]
    • Core Assembly System: Vertical: [________] to [____/____]
    • Core Assembly System: Pitched: [________] to [____/____]
    • Sub Assembly: Inner: [________] to [____/____]
    • Testing: [________]
    • Following trade sign off: [________]
    • Protection: [________]
    • Protection: maintenance/checking: [________]
    • Protection Removal: [________].
    • Cleaning: [__________].
    • Other requirements: [________].

    GBE Collaborate Services

    GBE Jargon Buster


    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    Elemental System Sub-Assembly Specification


    Insulated Thermal Break Edge Profiles for EWI

    Draft Specification clauses

    M21     INSULATION WITH RENDERED FINISH (EXTERNAL WALL INSULATION EWI)
    To be read with the Preliminaries/General conditions[ A10-A55 and A90]

    210E    EXTERNAL WALL INSULATION SYSTEM (EWIS)

    • Drawing Reference(s): [________]
    • Performance:
      • U value: [________] W/m2.K
      • No thermal bridges at abutments, openings, services.
    • Structural background/Substrate: [Masonry/Brickwork]
    • Preparation: [
    • Remove and reclaim to refit rainwater gutters and down pipes
    • Remove and reclaim to recycle lead flashings]
    • Pretreatment: Fungicidal wash if recommended by system manufacturer.
    • Insulated thermal break edge profiles to M21/260E
    • EWIS:
    • Manufacturer: [________]
    • Product Reference: [________]
    • BBA Agrément Certificate No.: [____/____]
    • Insulation material: [________]
    • Thickness: [________] mm.
    • Density: [________] kg/m³.
    • Minimum compressive strength: [________] kN/m².
    • Method of fixing: [________]
    • Render Base coat: [________]
    • Render carrier/Reinforcement mesh: [________]
    • Method of fixing: [________]
    • Corner reinforcement beads: [________]
    • Abutment stop beads: [________]
    • Render: [________]
    • Decorative finish: [________]

    260E    INSULATED THERMAL BREAK EDGE PROFILES FOR EWI

    • Drawing Reference(s): [________]
    • Constructive Details Ltd.:
      • CD0058 Thermo-Pro Soil Pipe
      • CD0107 Thermo-Bead
      • CD0108 Thermo-Trac
      • CD0109 Thermo-Pro Fascia
    • Reference Documents:
    •             Constructive Details Ltd.:
      • A handbook of thermal bridging details incorporating Instaclad insulated thermal profile solutions
      • Book 6 — Thermo-Pro Soil Pipe solution for insulating on retrofit External Wall Insulation
      • Book 8 — Cold bridging solutions for insulating on retrofit External Wall Insulation
    • External wall insulation system: See M21/210E
    • System Reference: Thermo-Pro®
    • Accessory References: [
      • 1          THERMO-BEAD See M21/265E
      • 2          THERMO-PRO SOIL PIPE See M21/270E
      • 3          THERMO-PRO FASCIA See M21/275E
      • 4a        THERMO-FLASH LEAD See M21/280E
      • 4b        THERMO-FLASH ALUMINIUM See M21/281E
      • 5a        THERMO-TRAC See M21/285E
      • 5b        THERMO-TRAC DYNAMIC See M21/286E
      • 6          THERMO-PRO GUTTER BOX M21/276E]
    • Manufacturer: Enviroform Solutions Ltd. Unit 16, Milltown Industrial Estate, Upper Dromore Road, Warrenpoint, Co. Down, BT34 3PN, Ireland.
    • T          028 4177 3314                        M         07730 766038
    • E          liam@enviroformsolutions.com           W         http://www.enviroformsolutions.com
    • Contact: Liam Brown, Managing Director
    • Supplier: Enviroform Solutions Ltd.
    • Installer: [Main Contractor/EWIS Contractor/Sub-contractor/Trade Contractor]
    • Checking and verification of installation: Use the Guidance Checklist in the Constructive Details handbooks [6 & 8]
    • Provide 2 copies of the completed checklist, signed by the installer’s Director, to the CA upon completion.

    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    Workmanship Specification Clause


    Draft Specification

    M21     INSULATION WITH RENDERED FINISH (EXTERNAL WALL INSULATION EWI)
    To be read with the Preliminaries/General conditions[ A10-A55 and A90]

     

    390E    INSTALL THERMAL BREAK TO WINDOW/DOOR OPENING JAMBS WITHIN EWI

    • See M21/260E.
    • Installation: Apply insulation across opening jamb, against both masonry and fixed window/door frame, with angle bead outwards from opening jamb in contact with outer-face of fixed frame of window/door, to receive render system.
    • External Wall Insulation (EWI) to outer face of brickwork and overlapping full thickness of jamb bead Insulation
    • External Render:
    • Overall thickness: 7 mm
    • Base coat: Applied to: outer face of EWI, Jamb face of EWI and exposed face of Aerogel to abut fixed window/door frame outer face.
    • Apply reinforcement mesh to basecoat and corner reinforcement.
    • Apply internal corner stop bead to mesh at junction with fixed window/door frame
    • Apply render top-coat to mesh and window/door stop bead.

    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    Waste Specification


    • CAWS/NBS/GBE Building Work section: A38
    • NBS/NGS/GBE clause number:  [____]
    • Uniclass/NBS Create Work section: [________]
    • NBS Create/NGS clause number: [________]
    • WASTE CLAUSE TITLE:
    • %%%pending
    • Packaging and Protection requirements
    • Recycling Opportunities
    • Reuse Opportunities
    • European Waste Catalogue reference
    • Waste Category
    • Waste Recycling and Reuse Appendix

    GBE Collaborate Services

    • GBE GBS Waste Specification

    Pending

    Document


     


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 5th January 2016

    Thermo-Pro®

    FM Spec In Use Maintenance Specification


    • CPD Seminar
    • Schedule
    • Method Statement
    • Specification
    • Availability
    • Spares
    • Maintenance
      • Frequency
      • Materials
      • Tools
    • COBie Data
    • MAINTENANCE CLAUSE:
    • %%%pending
    • CAWS/NBS Building Work section: [____]
    • NBS/NGS clause number:  [____]
    • Uniclass/NBS Create Work section: [________]
    • NBS Create/NGS clause number: [________]

    GBE Collaborate Services

    • GBE GBS FMSpec Specification clause

    Document

    Pending


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    End Of life Options


     

    • Pre Alteration Audit
    • Pre Demolition Audit
    • Soft Strip
    • Resale Opportunities
    • Reuse Applications
    • Reuse Accreditation
    • Deconstruction
    • Accessory Passport
    • Demolitions
    • Waste Category
    • European Waste Catalogue reference
    • Recycling Opportunities
    • CAWS/NBS Building Work section: [____]
    • NBS/NGS clause number:  [____]
    • Uniclass/NBS Create Work section: [________]
    • NBS Create/NGS clause number: [________]
    • END OF LIFE CLAUSE:
    • %%%pending

    GBE Collaborate Services

    • N#1677 GBE End of life

    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro® Thermo-Bead

    End Of life Options


     

    • Pre Alteration Audit
    • Pre Demolition Audit
    • Soft Strip
    • Resale Opportunities
    • Reuse Applications
    • Reuse Accreditation
    • Deconstruction
    • Accessory Passport
    • Demolitions
    • Waste Category
    • European Waste Catalogue reference
    • Recycling Opportunities
    • CAWS/NBS Building Work section: [____]
    • NBS/NGS clause number:  [____]
    • Uniclass/NBS Create Work section: [________]
    • NBS Create/NGS clause number: [________]
    • END OF LIFE CLAUSE:
    • %%%pending

    GBE Collaborate Services

    • N#1677 GBE End of life

    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro® Thermo-Bead

    Product/Accessory/System Passport


    • Product Passport
    • Accessory Passport
    • System Passport
    • Provenance
    • Pre Alteration Audit
    • Pre Demolition Audit
    • Original Building
    • Exposure Condition
    • Orientation
    • State of repair
    • Quantity
    • Properties
    • Evidence of Properties
    • Deconstruction
    • Demolitions
    • Palleting Packaging and Protection
    • Bar Code/QR Codes
    • Information Repositry
    • Resale Opportunities
    • Reuse Applications
    • Reuse Accreditation

    GBE Collaborate Services

    GBE Jargon Buster


    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®
    See Also:


    GBE Jargon Buster

    Jargon Buster Themes G#1333 N#1320

    • Refurbishment

    Jargon Buster Words and Phrases


    GBE Checklist


    GBE Code


    GBE Q&A


    GBE Defects

    • External Wall Insulation: Insulation with Rendered Finish
    • GreenDeal & ECO failings

    GBE CPD

    Theme


    GBE Lectures


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 13th February 2016

    Thermo-Pro®

    GBE Echo


    • Manufacturer’s Environmental Self-Declaration to ISO 14021
    • Independent Validation of Manufacturer’s claim to ISO 14021
    • Report
    • Evidence Documents
    • Factory Visits
    • Public Disclosure Document Schedule
    • URL to Repository for Public Disclosure Documents
    • 301 Redirects to maintain links

    %%%Pending


    GBE Collaborate Services:


    Pending

    Document


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    LCA Life Cycle Assessment

    EPD Environmental Product Declaration


    This EPD is for the Aerogel insulation only

    It was carried out Renuables (UK Consultant and later Sub-Partner of CAPEM LCA & EPD project)

    Spaceloft EPD PDF

    SpaceLoftAerogelEPD

     


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    GBE Classify


    CAWS 1987:

    • M21 Insulation with Rendered Finish

    CAWS Elemental 2012:

    • _

    CI/SfB 1976:

    • (21) Walls, External Walls
    • (21.9) Accessories
    • (41) Wall Finishes External
    • R Rigid Sheet Work
    • P Thick Coating Work
    • Z Joints
    • h Metals
    • m inorganic fibres
    • n Plastics
    • t fixing and jointing materials

    Uniclass 1997:

    • J M21 Insulation with Rendered Finish

    Uniclass Elemental 2012:

    • _

    Uniclass for BIM 2015:

    • _

    GBE Collaborative Service

    G#1479 N#1440 GBE Classify

     

    RIBACISfBBox RIBAClassification

    N#1441: 17/04/2014: GBE CLASSIFY:
    Service to classify literature developed to Samples Box labelling

    NGSCLASSIFYGeminiNGSCLASSIFYGeminiSamplesBoxLabel


    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    GBE Manufacturer



    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    GBE Supplier



    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    GBE Installers/Applicators


    COMPANY NAME: Many

    • Any EWI Manufacturer Approved Installer/Applicator
    • No specialist needed
    • Suitable for DIY Do It Yourself (bespoke product for DIY)
    • Suitable for BIY Build it Yourself (Self-Build)

    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    Thermo-Pro®

    GBE Swatch


    Plastic angle:

    • Thermo-Bead
    • Colour Options: not visible in finished works

    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    18th December 2015 – 9th January 2016

    © GBE NGS ASWS BrianSpecMan aka Brian Murphy
    9th January 2016 – 13th February 2016

    Leave a Reply

    Close Menu